AC 100T
OPERATION
05/10
5
Commissioning
Check whether finger guard plate (1) is present
and is sitting firm.
Check whether the die set (2) is free from foreign
matter.
Check whether the pneumatic tubing nuts (3)
have been tightened firmly.
Introduce the table clamp into the bore hole in
the tabletop unit and screw tightly to the
worktable.
Check the compressed-air supply:
min. 4 bar, max. 6 bar filtered air.
Connect the free connection (5) on the foot
switch to the compressed-air supply.
Operation
Introduce stripped wire, with wire-end ferrules
already fitted, at the side (1) in the hole
assigned to the cross-section.
Press the switch (2), the crimping process will
be triggered.
Release the switch (3), the crimped wire can be
removed again (4).
Fig. 2
Commissioning
Fig. 3
Operation