GLP
z
German Light Production
(instruction version 0.91)
6
2 Preparation
and
Installation
2.1 Mounting
Mount clamps and/or hooks directly to the mounting (relay) brackets of the
J
J
U
U
N
N
I
I
O
O
R
R
S
S
C
C
A
A
N
N
3
3
.
.
Please make sure to use right sized clamps and hooks and fit
them securely. Keep a safety distance of 0.5 m towards any easy inflammable
materials (decoration etc.).
Pay attention to the regulations of: BGV C1 (former VBG 70)
and DIN VDE 0711-217.
The installation should be done by qualified staff only.
2.2 Secure
the
J
J
U
U
N
N
I
I
O
O
R
R
S
S
C
C
A
A
N
N
3
3
Regardless of the rigging of the
J
J
U
U
N
N
I
I
O
O
R
R
S
S
C
C
A
A
N
N
3
3
you have to use a stipulated
safety wire that can hold at least 10 times the weight of the fixture. Install it
through the handle and connect it with the truss-support. Pay attention to a safe
and proper fastening.
2.3 Connectors
2.3.1 Power supply
230 Volt, 50 Hz,
Connected load 370W
<=>
2,2 A (blind current compensation).
or 115V, 60 Hz
Connected load 740W
<=>
4,4 A (blind current compensation).
2.3.2 DMX
USITT DMX 512 Standard input/output.
[+] = Pin 3 / [-] = Pin 2 / [Ground] = Pin 1
The DMX- Addressing starts at the DMX- Address [001].
2.4 Fuses
The
J
J
U
U
N
N
I
I
O
O
R
R
S
S
C
C
A
A
N
N
3
3
electronic system is protected by a 5x20 mm fuse.
230V / T 3,15A (EU model) or 115V / T 6,3A (US model)
Please see the printing on the
J
J
U
U
N
N
I
I
O
O
R
R
S
S
C
C
A
A
N
N
3
3
for more details.
Attention:
•
Disconnect AC outlet before changing a fuse!
•
Use only the original declared fuse type!