![Glow-worm Ultimate 3 Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/glow-worm/ultimate-3/ultimate-3_installation-and-maintenance-instructions-manual_2234605048.webp)
48
Installation and maintenance instructions Ultimate 3 0020239568_03
Index
A
Air intake pipe, removing..................................................... 30
Air/flue pipe, horizontal wall duct......................................... 14
Air/flue pipe, installing ......................................................... 21
Air/flue pipe, type C13 ......................................................... 14
Air/flue pipe, type C33 ......................................................... 14
Air/flue pipe, vertical roof duct ............................................. 14
Article number ....................................................................... 8
B
Burner anti-cycling time....................................................... 28
Burner anti-cycling time, resetting ....................................... 28
Burner, checking ................................................................. 31
Burner, removing................................................................. 30
Burner, replacing ................................................................. 33
C
CE marking............................................................................ 8
Check programmes ....................................................... 24, 36
CO
₂
content
Checking........................................................................ 30
CO
₂
content, checking......................................................... 27
Condensate discharge pipe................................................. 19
Condensate trap, cleaning .................................................. 32
Condensate trap, filling........................................................ 26
Control................................................................................. 22
D
Data plate .............................................................................. 8
Decommissioning ................................................................ 34
Diagnostics codes ............................................................... 24
Disposal............................................................................... 34
Documents ............................................................................ 8
F
Factory settings, restoring ................................................... 32
Fault codes.......................................................................... 32
Fault memory, calling up ..................................................... 32
Filling the heating installation .............................................. 26
Flue pipe, removing............................................................. 30
Front casing, installing......................................................... 15
Frost protection ..................................................................... 9
G
Garantie................................................................................. 6
Gas Council Number ............................................................. 8
Gas flow rate ...................................................................... 26
Gas group, checking ........................................................... 18
Gas setting .......................................................................... 26
Gas-air mixture, removing ................................................... 30
H
Handing over to the end user .............................................. 28
Heat exchanger, cleaning.................................................... 31
Heating pump, connecting................................................... 22
Heating system, open.......................................................... 17
Heating water supply, open heating system........................ 17
I
Ignition electrode, checking................................................. 31
Inspection work ................................................................... 30
Inspection work, completing ................................................ 32
Installation, preparations ..................................................... 17
Intended use.......................................................................... 3
K
Kammerbelüftung ................................................................ 11
Kundendienst ........................................................................ 6
L
Leak-tightness ............................................................... 28, 34
M
Maintenance work ............................................................... 30
Maintenance work, completing............................................ 32
Minimum clearance ............................................................. 11
Mounting template............................................................... 15
O
Overheating protection .......................................................... 9
P
Packaging, disposing of ...................................................... 34
PCB, replacing .................................................................... 34
Power supply....................................................................... 22
Product, decommissioning .................................................. 34
Product, draining ................................................................. 32
Product, mounting ............................................................... 15
Product, switching on .......................................................... 26
R
Regulations ........................................................................... 5
Repair work, preparing ........................................................ 33
Replacing the heat exchanger............................................. 33
S
Safety devices ....................................................................... 9
Serial number ........................................................................ 8
Setting the burner anti-cycling time ..................................... 28
Side section, installing......................................................... 16
Side section, removing ........................................................ 15
Spare parts.......................................................................... 33
Standards .............................................................................. 5
Switching on ........................................................................ 26
T
Treating the heating water .................................................. 25
U
User interface, replacing the PCB ....................................... 34
V
Validity of the instructions...................................................... 8
W
Weight ................................................................................. 15
Wiring, carrying out ............................................................. 21
Содержание Ultimate 3
Страница 1: ...en Installation and maintenance instructions Ultimate 3 25r A H GB 0020239568_03 31 07 2020...
Страница 49: ......
Страница 50: ......
Страница 51: ......