7.7
Gas connection
1
1.
Establish the gas connection
(1)
in accordance with the
applicable standards.
2.
Purge the gas line before start-up.
3.
Check the entire gas line properly for leak-tightness.
7.8
Connecting the condensate discharge pipe
1
2
▶
Follow the instructions listed here and observe directives
and local regulations on condensate discharge.
▶
Use PVC or another material that is suitable for draining
the non-neutralised condensate.
▶
If it cannot be guaranteed that the materials the drain
pipework is made from are suitable, install a system for
neutralising the condensate.
Note
The condensate drain pipework must have a
continuous fall (45 mm per metre) and should
whenever possible terminate at a suitable
drain point within the heated envelope of the
building that will remain frost free under long
periods of low external temperatures.
▶
Connect the condensate trap
(1)
. Use the supplied drain
hose
(2)
for this.
Note
Ensure that the connection between the con-
densate discharge pipe and the drain hose is
not air-tight.
▶
Connect a condensate discharge pipe (21.5 mm, not
included in the scope of delivery) to the drain hose
(2)
.
▶
During installation remove all burs from inside of cut pipe
work and avoid excessive adhesive which may trap small
pockets of water close to the pipe wall which can freeze
and build into a larger ice plug.
▶
For any installation the condensate must be free flowing
and not be possible for air back-pressure to prevent wa-
ter flow.
▶
As with other pipe work insulate the condensate dis-
charge pipe to minimise any risk of freezing and beware
when crossing cavities that the fall is maintained and the
pipe sleeved.
You can find further information in the "BS 6798" specific-
ation for installing and maintaining gas-fired boilers with a
nominal heat input of less than 70 kW.
7.8.1
Condensate discharge systems
It is not necessary to provide extra traps in the discharge
pipe as there is already a trap inside the boiler. Fitting an
extra trap may cause the boiler siphon to work incorrectly.
Refer to BS5546 or BS6798 for further advice on disposal of
boiler condensate.
7.8.1.1 Direct Connection to internal soil and vent
stack
Ø22mm
Preferred option
7.8.1.2 Direct connection to external soil and vent
stack
Ø22mm
Ø 32mm
≤ 3 m
Содержание Ultimate 3
Страница 1: ...en Installation and maintenance instructions Ultimate 3 25r A H GB 0020239568_03 31 07 2020...
Страница 49: ......
Страница 50: ......
Страница 51: ......