10.1 Mounting the Boiler
After installing the boiler mounting frame, domestic and
heating water systems, making the electrical connections
and preparing the flue components, carry on as below:
Lift the boiler into position, hooking it on the boiler
mounting frame at the top, then loosely fit the two boiler
securing screws at the top, see diagram 6.3.
10.2 Gas and Water Connections
Locate the boiler water pipes into the isolation valves
and the gas service cock union halves. Fully push the
boiler back to the mounting frame, locating the studs into
the clips.
Make the compression joint on the isolating valves and
join the gas service cock union. Secure all of the valves
and gas service cock with the clips.
10.3 Boiler Securing
Secure the boiler by tightening the two boiler securing
screws at the top.
10.4 Discharge Pipe
Remove the two control housing securing screws,
see diagram 10.1.
Remove the control housing and support the control
housing on a surface or by screwing it to the front edge
of the base, using one of the securing screws,
see diagram 10.1.
If required , to improve access, the air pressure switch
can be removed, refer to the service instructions,
section 4.31.
Fit the short discharge pipe to the safety valve using the
nut and olive supplied loose, see diagram 10.2.
Extend the discharge pipe, using only a compression
type fitting to join the discharge extension, refer also to
Section 8.3 “Safety Valve Discharge”.
10.5 Clock/timer Kit (if applicable)
Fit the clock/timer kit following the appropriate sections
of the instructions supplied with it.
10.6 Electrical Connector
Connect the two halves of the electrical
connector together.
Clip the connector into position on the boiler mounting
frame. Secure the cables with cable clamp immediately
behind the connector.
Carry out preliminary electrical system checks as below:
1. Test insulation resistance to earth of mains cables.
2. Test earth continuity and short circuit of all cables
3. Test the polarity of the mains.