Glow-worm Micron 100FF Скачать руководство пользователя страница 22

22

221954D

Instruct and demonstrate the safe and efficient operation of the
boiler, heating system and domestic hot water system.

Advise the user, that to ensure the continued efficient and safe
operation of the boiler it is recommended that it is checked and
serviced at regular intervals. The frequency of servicing will
depend upon the particular installation and usage, but in general
once a year should be enough.

Draw attention, if applicable, to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance in the UK.

It is the Law that servicing is carried out by a 

competent

person.

Advise the user of the precautions necessary to prevent damage
to the system and the building in the event of the heating system
being out of use during frost and freezing conditions.

Reminder - Leave these instructions and the “Benchmark”
logbook with the user.

Diagram 10.1

SECURING NUT AND

SHAKEPROOF

WASHER

PILOT PIPE

UNION
CONNECTOR

ELECTRODE AND

LEAD ASSEMBLY

4094

10 Servicing

9 Instructions to the User

REMEMBER:

  When replacing a part on this appliance, use

only spare parts that you can be assured conform to the safety
and performance specification that we require.  Do not use
reconditioned or copy parts that have not been clearly authorised
by Glow-worm.

NOTES:

  To ensure the continued efficient and safe operation

of the boiler it is recommended that it is checked and serviced
as necessary at regular intervals.  The frequency of servicing
will depend upon the particular installation conditions and
usage, but in general once a year should be enough.

It is the Law that any servicing is carried out by a 

competent

person.

Before servicing turn off the gas and isolate the electrical supply
to the boiler.

After completing a service always test for gas soundness and
carry out functional check on controls.

Unless stated otherwise all parts are replaced in the reverse
order to removal.

10.1 Access

Refer to diagram 8.6 and slide controls cover forward and off.

Remove the outer case, see diagram 8.5.

NOTE:

  As an aid to servicing the air pressure switch tube

connections can be used to obtain a products of combustion
reading.

Remove the RED tube from the connection on the air pressure
switch and insert the analyser probe into the tube.

Switch on the electrical supply to operate the fan and turn on the
gas supply.

On completion of the test switch off the electrical supply and the
gas supply and reconnect the red tube to the air pressure
switch.

10.2 Cleaning Heat Exchanger and Burner

Disconnect the air pressure tubes, see diagram 5.3.

Remove the blue and red electrical connections from the fan,
see diagram 5.3.

Remove the fan taking care not to damage the gasket, see
diagram 5.3.

Remove the flue hood, see diagram 5.4.

Remove the combustion chamber cover, see diagram 8.2.

Remove the cleaning plate from the combustion chamber
cover, see diagram 8.2.

Disconnect the pilot pipe union connector and pilot burner,
securing nut and shakeproof washer together with the pilot
shield.  Remove the pilot burner assembly taking care not to
damage the electrode and lead assembly, see diagram 10.1.

Remove the securing screw from the burner support bracket,
see diagram 10.2.

Remove the main burner from the main injector at the rear.
Raise the burner up and forward, easing the pilot pipe down, to
clear, take care not to damage the combustion chamber insulation
or the pilot pipe.

Use a vacuum cleaner or suitable stiff brush to clean the burner
thoroughly, making sure that all the burner ports are clear and
unobstructed.

Place a sheet of paper in the base of the combustion chamber.

Содержание Micron 100FF

Страница 1: ...e f t w i t h t h e u s e r 4272 Instructions for Use Installation and Servicing G C No 41 047 52 G C No 41 047 23 REGISTER YOUR GLOW WORM APPLIANCE FOR 1ST YEAR GUARANTEE PROTECTION CALL 0800 073 21...

Страница 2: ...ified by Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuel...

Страница 3: ...nstallation and Use Regulations Section 35 It is the law that any servicing is carried out by a competent person To obtain service please call your installer or Glow worm s own Service Organisation us...

Страница 4: ...hes off and the main burner lights The flames can be seen through the viewing window see diagram 8 2 The main burner will remain alight until switched off by the control thermostat or any remote contr...

Страница 5: ...ion CheSS and 2 GPG 302 2001 Controls for domestic central heating system and hot water BRECSU 1 2 Data See Table 1 All dimensions are given in millimetres except as noted The Seasonal Efficiency Dome...

Страница 6: ...132 5 835 772 63 132 43 78 5 1 11 Location This boiler is not suitable for outdoor installation The boiler may be installed in any room although particular attention is drawn to the requirements of BS...

Страница 7: ...allow for easy removal of the boiler 1 General FRONT VIEW 6mm 6mm 6mm 160mm 500mm From a permanent surface ADDITIONAL CLEARANCES MAY BE REQUIRED FOR INSTALLATION 6mm 6mm 65mm Diagram 1 3 DATA LABEL Wh...

Страница 8: ...eral NOTE Lift weight is with Flue Elbow Controls Cover and Front Cover removed DATA TABLE 1 MODEL TOTAL DRY WEIGHT Including Terminal LIFT WEIGHT WATER CONTENT GAS CONNECTION ELECTRICITY RATING WATER...

Страница 9: ...of 50mm clearance from any part of the terminal and be central over the terminal see diagram 2 2 A suitable guard reference Type K3 can be obtained from Tower Flue Components Ltd Morley Road Tonbridge...

Страница 10: ...pump to operate onbypassonly thebypassconnectionmustbeatleast2 5metres away from the boiler The flow through the boiler must not be allowed to fall such that thereisatemperaturedifferencegreaterthan2...

Страница 11: ...of BS5449 and BS7074 Part 1 for IE refer to the current edition of I S 813 Domestic Gas Installations The charge pressure must not be less than the static head of the system that is the height of the...

Страница 12: ...sition before starting Refer to diagram 4 1 or 4 2 NOTE If a longer flue duct is required DO NOT extend the telescopic flue beyond its maximum length A 1 2 or 3metre flue system and terminal MUST be u...

Страница 13: ...e from the outside wall face to the boiler centre line Check that the flue length will be suitable see diagram 4 3 Extend the standard telescopic flue to the required length making sure that the minim...

Страница 14: ...4 5 then cut to length cutting square and removing any burrs NOTE Owing to its variable length the standard telescopic flue may not need cutting 4 10 Flue Assembly Locate the flue duct drilled end on...

Страница 15: ...3 CLEAR RED FLUE HOOD SECURING SCREW 4 FAN SECURING SCREWS FAN ASSEMBLY AIR PRESSURE SENSING PIPES CLEAR ELECTRICAL CONNECTIONS 4287 Diagram 5 5 Diagram 5 4 FLUE HOOD SECURING SCREWS 4 FAN SECURING BR...

Страница 16: ...int screws see diagram 6 2 Make sure of the correct fitting of the flue to the boiler Pull the flue duct forwards and engage onto the flue elbow Push the air duct back into the wall to the dimension s...

Страница 17: ...ed NOTE Open Vented Water Systems ONLY Bridge terminals K1 and K2 7 3 Pump Connection The pump must be connected directly to the control box as shown in diagram 7 2 threading the cable through the cab...

Страница 18: ...k must be carried out by a competent person in accordance with the current issue of BS6798 Make sure that all naked lights and cigarettes are out Identify the controls by reference to diagram 8 1 Chec...

Страница 19: ...tat or a remote system control To make sure that the flame supervision device is working correctly the following should be done 1 With the main burner alight turn the gas service cock Off see diagram...

Страница 20: ...er should be turned off and the system drained off as rapidly as possible whilst still hot 8 7 Adjustment Fully Pumped Open Vented and Sealed Water Systems When commissioning the system the boiler sho...

Страница 21: ...thermostat calibration screw Operate the boiler again on full service and check that the balancing is satisfactory making adjustments as necessary Fit the front cover by hooking it under at the top an...

Страница 22: ...ng turn off the gas and isolate the electrical supply to the boiler After completing a service always test for gas soundness and carry out functional check on controls Unless stated otherwise all part...

Страница 23: ...d when refitting to make sure a gas tight seal is made NOTE On refitting and after cleaning the heat exchanger make sure the burner is fitted correctly that is located on the main injector and horizon...

Страница 24: ...PCB fuse Ignition pilot or flame proving fault see detailed fault finding chart Air flow proving fault that is fan or air pressure switch see detailed fault finding chart Multi functional control har...

Страница 25: ...control thermostat to its maximum setting Also check fuses Check overheat reset If satisfactory replace overheat device Is neon 2 lit NO Is there 230V between K1 and N YES YES Check 0 2 Bar of water p...

Страница 26: ...stop after several minutes YES Does the pump run when SL is applied Does pump continue to run after SL is interrupted NO NO System satisfactory YES The PCB has a pump overrun facility The pump should...

Страница 27: ...RODE SEQUENCE BOARD CHASSIS EARTH g y p b br CHASSIS EARTH g y p or b w y y CONTROL THERMOSTAT OVERHEAT CUTOFF br L N E N L E b b br g y br C NC g y w 230 50Hz PERMANENT MAINS SUPPLY FUSED AT 3 AMP CI...

Страница 28: ...llary 12 3 Overheat Cutoff Device diagram 12 1 12 2 and 12 2A Remove and support the electrical control box refer to Section 7 1 Remove the overheat cutoff electrical connections Disconnect the air pr...

Страница 29: ...indow diagram 12 5 Remove the old self adhesive aluminium foil gasket and the old mica window Replace with a new mica window Peel off the backing paper and secure with new self adhesive aluminium foil...

Страница 30: ...essure tubes and the electrical connections from the PCB release the screws and remove the switch When fitting the replacement make sure that the plastic tubes and electrical connections are made as s...

Страница 31: ...on is remade onto the new fan assembly The polarity of the other connections is not important 12 15 Water Pressure Switch Sealed Water System Only Release the water pressure and drain refer to Section...

Страница 32: ...27 Injector 100FF Diagram 10 6 278 197 3a 205726 Injector 120FF Diagram 10 6 278 196 4 203432 Pilot burner 100FF Diagram 10 7 278 023 4a 203434 Pilot burner 120FF Diagram 10 7 E00 998 5 2000801236 Mic...

Отзывы: