Glow-worm Hideaway 40C FF Скачать руководство пользователя страница 19

19

2000225005B

7  Instructions to the User

Instruct and demonstrate the safe and efficient operation of the boiler, heating system and domestic hot water system.

Advise the user, that to ensure the continued efficient and safe operation of the boiler, it is recommended that it is checked and
serviced at regular intervals.  The frequency of servicing will depend upon the particular installation and usage, but in general once
a year should be enough.

Draw attention, if applicable to the current issue of the Gas Safety (Installation and Use) Regulations, Section 35, which imposes
a duty of care on all persons who let out any property containing a gas appliance.

It is the Law that servicing is carried out by a competent person.

Advise the user of the precautions necessary to prevent damage to the system and building in the event of the heating system being
out of use during frost and freezing conditions.

Reminder - Leave these instructions and the “Benchmark” logbook with the user.

8  Servicing

REMEMBER, When replacing a part on this appliance, use only
spare parts that you can be assured conform to the safety and
performance specification that we require. Do not use
reconditioned or copy parts that have not been clearly authorised
by Hepworth Heating Ltd.

Products of Combustion Check

Note: To obtain a products of combustion reading, remove the
front panel and remove the control box as descibed in the
relevant paragraphs of section 4.8.   Next, remove the cap from
the sampling point, located on the top of the left hand side of the
inner casing, see diagram 8.1.

Connect the analyser tube on to the nipple.

WARNING.

    The multifunctional control and fan operate on

mains voltage, terminals will become live.

Switch on the electrical supply and gas supply then operate the
boiler.

On completion of the test switch off the electrical supply and gas
supply, remove analyser tube and replace sampling point cap.

Servicing

Before servicing turn off the gas and isolate the electrical supply
to the boiler.

After completing a service always test for gas soundness, make
electrical checks and carry out functional check on controls.

Unless stated otherwise all parts are replaced in the reverse
order to removal.

Diagram 8.3

ELECTRICAL
WIRE
RETAINING
CLIPS

CONTROL BOX
SUPPORT
BRACKET

Diagram 8.2

GAS
SERVICE
COCK
UNION

ELECTRICAL
PLUG

Diagram 8.1

SAMPLE POINT

SECURING
SCREW

Содержание Hideaway 40C FF

Страница 1: ...r Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Chimney Fanned Flue Boiler This is a Cat I2H Appliance Reference in these...

Страница 2: ...provide information on substances hazardous to health Ceramic Fibre Insulation Pads GlassYarn These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaint...

Страница 3: ...rained off to avoid the risk of freezing up If an immersion heater is fitted to the hot water cylinder make sure it is switched off Maintenance Toensurethecontinuedefficientandsafeoperationoftheboiler...

Страница 4: ...trol wait at least 30 seconds before switching on again When the boiler switches off the burner will go out The automatic lighting sequence will operate again when heat is required It should be noted...

Страница 5: ...5 76 litre 1 27gallons Gas connection Rc1 2 1 2 in BSPT Water connection Rc1 1in BSPT Electrical supply 230V 50Hz fused 3A Burner Aeromatic A B C D E F G H J K L M 300 115 558 294 384 555 440 3 Max 9...

Страница 6: ...o provide a steady inlet working pressure of 20mbar 8in wg at the boiler On completion test the gas installation using the pressure drop method and suitable leak detection fluid purge in accordance wi...

Страница 7: ...its and fixtures Combustible material must be 25mm 1in away from flue components see diagram 1 7 A front access clearance for servicing should be provided as shown in diagram 1 8 The boiler must not b...

Страница 8: ...the boiler a minimum static head of 1metre 3ft3in must be provided between the water line of the feed tank and the centre of the waterway see diagram 2 2 2 5 Circulation Pump Normallythepumpshouldbes...

Страница 9: ...nd of the flue liner at the chimney top must be adequately sealed and clamped using proprietary fittings suitable for the flue liner used see diagram 3 1 The flue should preferably end above ridge hei...

Страница 10: ...thavethedoorremoved for ventilation reasons The air vents must have minimum areas see Compartment Air Vent table Thefiguresquotedrefertotheminimumacceptable effective area Both the high and low level...

Страница 11: ...tappings see diagram 4 1 Make sure that all pipes are taken backwards and will clear the casings Heating flow Any one of the four upper connections may be used Domesticflow Anyoneofthethreeremainingup...

Страница 12: ...bowisused Ifthepipeworkisrequired to run back to the wall make sure that it will clear the boiler air duct and if working to minimum clearance does not project too far from the boiler see diagram 4 5...

Страница 13: ...ater connections are made on both sides of the boiler or if the boiler is screened by fixtures The in fill panel will usually be fitted on the side where there are no pipework connections Insert the p...

Страница 14: ...ter Kit take the chimney flue adapter and remove restrictor securing screw select and fit appropriate restrictor 40C FF marked A 50 60C FF marked B then secure in place with the previously removed scr...

Страница 15: ...tted Thecondensatedrainconnectionisonthechimneyflueadapter see diagram 4 15 A 22mm plastic overflow pipe should be used to fit on to the drain connection and discharge to a drain The drain pipe should...

Страница 16: ...Make sure the cable is suitably secured When making connections make sure that the earth conductor ismadeofagreaterlength thanthecurrentcarryingconductors so that if the cable is strained the earth c...

Страница 17: ...COMPONENTS 10052 A CONTROL BOX B PHIAL POCKET C GAS SERVICE COCK D BURNER ON NEON E RESET NEON F TEMPERATURE CONTROL G BURNER PRESSURE TEST POINT H GAS PRESSURE ADJUSTMENT SCREW J DATA LABEL E D A G T...

Страница 18: ...3 h are for guidance only dependent on the heat setting Turn the boiler temperature control fully anti clockwise to 0 Isolate from the electrical supply Remove the pressure gauge from the test point a...

Страница 19: ...be assured conform to the safety and performance specification that we require Do not use reconditionedorcopypartsthathavenotbeenclearlyauthorised by Hepworth Heating Ltd Products of Combustion Check...

Страница 20: ...the wing nut that secures the top of the heat shield and carefully hinge down control box and heat shield see diagram 8 6 Release the two toggle latches that secure the fan access door and remove see...

Страница 21: ...ar of the burner to release the burner see diagram 8 10 Clean the burner Use a vacuum cleaner or suitable stiff brush not wire to clean the burner thoroughly making sure that all the burner ports are...

Страница 22: ...access door and the combustion chamber cover Examine the flue hood and terminal to make sure they are clean and clear of obstructions Refit all parts Light the boiler and carry out functional tests as...

Страница 23: ...c between Ls and N Ensure that any external controls are calling for heat and circuit water is cold If neon 6 is lit flame failure has occured Reset boiler by turning temperature control to Off waitin...

Страница 24: ...on the control panel is lit turn the burner temperaturecontrol to 0 wait30seconds thenfullyclockwise to Max see diagram 9 1 Diagram 9 3 9856 9 Fault Finding FUSE TYPE F4A AIR PRESSURE SWITCH CONNECTIO...

Страница 25: ...3 NEON 4 NEON 5 NEON 6 NEON KEY see P C B FAN P C B CONTROL BOARD GAS CONTROL VALVE TERMINAL BLOCK THERMISTOR AIR PRESSURE SWITCH NEON 1 NEON 5 NEON 4 NEON 6 NEON 2 NEON 3 F4A FUSE p y g p b bk bk bk...

Страница 26: ...ecuring thermistor lead at the side of control box Disconnect the thermistor electrical plug from the control board P C B slightly bending back the retaining latch to allow withdrawal see diagram 10 2...

Страница 27: ...ion chamber The injector can then be unscrewed from the manifold When replacing use a little jointing compound on the external thread only to ensure a gas tight seal 10 8 Air Pressure Switch Remove fr...

Страница 28: ...7070 Air pressure switch 40 50C FF 3 227097 Air pressure switch 60C FF 4 2000461793 Electrical thermistor 5 202635 Spark electrode 6 227098 Fuse 7 2000461714 Boiler temperature control knob 8 K7218 In...

Отзывы: