Glow-worm COMPACT 75e Скачать руководство пользователя страница 29

29

221895A

13 Fault Finding

TO TEST FOR COMPONENT  OPERATION / FAILURE

Power to the appliance :- Test for 230V~ across live (brown) and earth (yellow and green), 230V~ across live and neutral (blue),
and zero potential across neutral and earth.

Thermistors :- With the power off unplug the connector and test resistance is 10k ohms  at 25

°

C

Differential pressure switch :- With the power off seperate the in-line connector and test for continuity across male end. restore
the power and with demand off, open circuit, demand on closed circuit

Domestic Hot Water demand switch :- With the power off seperate in-line connector and test for continuity across male end.
Tap open, continuity between black and white cables, black and red are open circuit. With demand off there is continuity between
black and red and that black and white are open circuit.

Overheat thermostat :- With the power off unplug the connectors and test for continuity (zero resistance).

Power to the gas control valve :- With a demand on test for voltages of 24 to 50V~ across the black and white cable connectors
and 130V~ across the red and blue cable connectors.

Power to the fan :- With a demand on and the front cover removed test for 230v~ at the fan connectors.

Fan failure :- with the power off and the supply leads to the fan disconnected (pull the boots only) the resistance across the fan
coil should not be greater than 50

.

Pump :- With the power off unplug the connector from the pump. Restore the power and check that there is 230V~ between live
(red) and neutral (black) or  live and the appliance earth.

Air pressure switch :- With the power off and the front cover removed pull one of the supply cables from the fan and ensure
it is electrially safe. Restore the power establish a demand, check that there is 230v~ at one of the APS cables but not at the other.
Turn the power off, refit the fan  cable, restore the power and check that there is now 230V~ at both the APS connectors (Caution,
the appliance will light unless the spark leads are temporarily unplugged from the electrodes and laid where they cannot spark
and ignite the gas and are electrically safe). This indicates that the APS changes state when the fan is run.

The three way valve :- Seperate the cable connector from the motor noting its orientation and the connector numbering marked
on the motor housing. Check that with a DHW demand there is 230V~ across sockets 2 and 1 and with a CH demand there is
230V~ across sockets 2 and 3 (or ground and 1, ground and 3 respectively).

13.3 Electrical

Preliminary electrical system checks, as outlined in a Multimeter
Instruction book, are the first checks to be carried out during a
fault finding procedure.

Isolate the boiler from the electrical supply, refer to Section
11.3.

Gain access to the boiler controls by removing the outer case
front, refer to diagram 10.5.

Remove the two screws securing the controls facia, see diagram
9.1.

Hinge the control facia forward.

Remove the controls board cover by slackening the cable entry
cover screws, see diagram 10.2.

Remove the covers.

Ease the cover up and clear.

Check that all cables, multipin connectors and connectors are
secure on the board.

Test the fuse on the main control board and renew as necessary.
Fuse 1 type (2AT).  If a fuse fails repeatedly or the initial fault-
finding checks described in Section 13.1 indicate a boiler fault,
check the boiler electrical circuits and follow the fault finding
procedures, see diagram 13.2, 13.3, and for clock/timer fault
finding, diagram 13.4 and 13.5.

On completion of a fault finding task that has required the
disconnection and making of electrical connections then checks,
for earth continuity, polarity and resistance to earth must be
carried out.

Before replacing any part please read points below:-

Replacement of parts must only be carried out by a competent
person.

1. Refer to Section 11.1.

2. Always isolate the boiler from the electrical supply and as
required, the gas supply, as Section 11.3.

3. On completion, make good any water loss and pressurise the
system to initial design pressure, refer to “Commissioning” in
the Installation Instructions.

Before starting refer to Section 11.1

Isolate the boiler from the electrical supply, refer to Section
11.3.

Содержание COMPACT 75e

Страница 1: ...liances are manufactured to the very highest standard so we are pleased to offer our customers a Comprehensive First Year Guarantee In the centre pages are to be found your Guarantee Registration Card...

Страница 2: ...atibility Substances Hazardous to Health The adhesives and sealants used in this appliance are cured and give no known hazard in this state INSULATION PADS CERAMIC FIBRE GLASSYARN MINERAL WOOL These c...

Страница 3: ...o its use Alternatively a fused 3A 3 pin plug and shuttered unswitched socket may be used Thecoloursofthreecoreflexiblecableare blue neutral brown live green and yellow earth As the markings on your p...

Страница 4: ...l not operate Soft Override button indicated by the symbol this function will override the current central heating programme for the next available ON time programmes are indicated by the symbol 3 Set...

Страница 5: ...is opened while the boiler is on for heating priority will be given to hot water Toturntheheatingoffforshortperiods setbutton J tosummer Off light L will illuminate To turn on again set button J to wi...

Страница 6: ...ief Safety Valve CAUTION A pressure relief safety valve and discharge pipe is fittedtotheboiler Thisvalvemustnotbetouched Shouldthere be any discharge from the pipe turn the boiler off isolate from th...

Страница 7: ...rating of dwellings The test data from which it has been calculated have been certified by B S I Diagram 1 1 Optional flue kits are available Horizontal top outlet and Vertical Lift Weight 31 7kg 69...

Страница 8: ...General Data Thermostatic radiator valves may be installed however they must not be fitted in a room where the room thermostat is located Note All systems must have at least one radiator not fitted w...

Страница 9: ...he installation of the boiler will be in an unusual position the current issue of BS6798 gives detailed guidance on these requirements An existing cupboard or compartment modified for the purpose may...

Страница 10: ...painted gutter an aluminium shield 750mm long should be fitted immediately beneath the guttering or eaves 3 3 Flue Options There are various flue systems to choose from as follows Standard Top Outlet...

Страница 11: ...the flow diagram 4 2 This valve must be lockable and positioned so that inadvertent closure or unauthorisedinterferenceisnotpossible Thedesigndifferential can be between 11 C 20 F and 17 C 30 F depend...

Страница 12: ...domestic hot water service must be in accordance with the rules in force in the countries of destination 5 2 Water Pressure For the minimum and maximum working pressures of the domestic hot water circ...

Страница 13: ...r also to Section 5 Domestic Hot Water System Provision is made for the water connections to be connected from below or from above passing down either side of the boiler Take care that any pipework co...

Страница 14: ...ion kits may be joined together STD EXTD X plus 254mm RH flue length X plus 10mm LH flue length EASYFIT X plus 282mm RH flue length X plus 38mm LH flue length must include 50mm min side clearance REAR...

Страница 15: ...site the expanded end If the boiler is not to be fitted for some time cover the hole in the wall 7 3 Internal Access Flue If access to the outside wall is not practical the flue system can be installe...

Страница 16: ...ove the fan and flue collector assembly by pulling it forward see diagram 8 3 Remove the rear outlet restrictor plate and retain if using the rear flue outlet see diagram 8 4 REAR FLUE ONLY Fit the fl...

Страница 17: ...screws provided in the fittings pack see diagram 8 6 An anti theft kit is available Kit No 457110 8 4 Discharge Pipe Fit the short discharge pipe to the safety valve using the nut and sealing washer s...

Страница 18: ...PE 8 Mounting the boiler SAFETY VALVE DISCHARGE SEAL PRESSURE GAUGE CONNECTION DISCHARGE PIPE 7405 Diagram 8 7 Fit the air duct into the flue spigot by pulling the air duct into the flue spigot locati...

Страница 19: ...m the flue collector secured with a screw and retaining lip Fit the flue connecting sleeve onto the fan see diagram 8 12 Fit the fan to the flue ducting Holding it up in position fit the flue collecto...

Страница 20: ...equired to provide a minimum of reinforced insulation at 250Vrms between the parts of those devices operating at mains hazardous voltage and the user accessible parts af those devices Note For further...

Страница 21: ...T STAT L N R1 R2 3 AMP FUSE L N 230V 50Hz PERMANENT MAINS SUPPLY POTENTIAL FREE ROOM STAT NO FROST STAT TO BOILER RED LINK REMOVE WHEN CONNECTING SYSTEM CONTROLS 5 WAY TERMINAL BLOCK POTENTIAL FREE RO...

Страница 22: ...should be required Check the burner pressure is within 0 2mbar of 14 7mbar If this is incorrect the burner pressure may be adjusted to the correct setting by turning the hot water gas pressure adjuste...

Страница 23: ...from the electrical supply and drain the system rapidly whilst still hot Remove the inner case front Fill and vent the system as described in Section 10 2 Filling the Central Heating Circuit Add inhi...

Страница 24: ...e Gas Safety Installation and Use Regulations Section 35 which imposes a duty of care on all persons who let out any property containing a gas appliance It is the Law that any servicing is carried out...

Страница 25: ...to release then remove see diagram 10 5 11 5 Inner Case Front Remove the inner case front secured by two clamps at the bottom lift up and unhook at the top see diagram 8 1 11 6 System Pressures and Dr...

Страница 26: ...he burner thoroughly making sure that all burner ports are clear and unobstructed Diagram 12 1 9408 BURNER SECURING SCREW 3 LEADS 3 SENSING ELECTRODE SILICONE SLEEVE 3 EARTH ELECTRODE IGNITION ELECTRO...

Страница 27: ...s 0 7bar minimum and that the automatic air vent works Refer to Installation Instructions Section 10 2 3 That the gas supply is available at the boiler and purged of air 4 That the boiler is set for t...

Страница 28: ...TIMER 7467 Diagram 13 2 MAINS FUNCTIONAL FLOW 7670 grey orange PCB purple white black X5 X5 X4 X4 X4 X4 X4 X3 X3 X5 DHW FLOW SWITCH purple purple orange orange X5 CH THERMISTOR DHW THERMISTOR CONTROL...

Страница 29: ...e temporarily unplugged from the electrodes and laid where they cannot spark and ignite the gas and are electrically safe This indicates that the APS changes state when the fan is run The three way va...

Страница 30: ...kout L E D is illuminated press reset Check 230V supply to pump Check 230V supply to fan Check spark electrodes and cables If domestic hot water demand is still illuminated Faulty domestic hot water s...

Страница 31: ...eck continuity of clock timer harness ensure an electrical supply is available ensure that remote controls are calling for heat NB The clock can be by passed by refitting the plug link which should be...

Страница 32: ...ectrode lead and silicone sleeve remove the securing screw and electrode see diagram 12 1 14 5 Ignition Earth and Sensing Leads Before starting refer to Section 11 Disconnect the silicone sleeve and l...

Страница 33: ...starting refer to Section 11 Remove the two screws securing the controls cover door and controls fascia see diagram 9 1 Hinge the assembly open Disconnect multi pin connector Support the gas control...

Страница 34: ...move the plastic cover Remove the electrical connectors Refer to wiring diagram 14 29 when fitting 14 12 Safety Valve Before starting refer to Section 11 Remove the two screws securing the controls co...

Страница 35: ...bly forward Disconnect the electrical connections unclip to remove themistor see diagram 14 4 14 17 Flow Regulator Filter Before starting refer to Section 11 Drain domestic hot water Remove outer case...

Страница 36: ...O RING PRESSURE DIFFERENTIAL MICRO SWITCH Diagram 14 16 6987 SECURING CLIP Diagram 14 17 6983 SECURING CLIP DOMESTIC HOT WATER MICRO SWITCH REGULATOR SECURING PIN O RING 6991 DIVERTER SWITCH DIVERTER...

Страница 37: ...ve multi pin connector Remove securing pins 4 5 and 6 see diagram 14 18 ELECTRICAL PLUG 7019a PRESSURE DIFFERENTIAL MICRO SWITCH Diagram 14 18 HYDRO BLOCK ASSEMBLY DIVERTER SWITCH 14 Replacement of Pa...

Страница 38: ...bracket Pull the boiler from the isolating valves Unhook the boiler at the top easing the boiler from the flue outlet and lift off Carefully lay the boiler down on its side for access to the expansio...

Страница 39: ...et pipes Remove the combustion chamber main panel securing screws Remove the heat exchanger combustion chamber assembly Remove heat exchanger front retaining clips Remove the heat exchanger from its r...

Страница 40: ...see diagram 14 25 Slide out both side insulation pieces Pull the lower rear insulation forwards then slide the upper rear insulation down from behind the heat exchanger 14 28 Viewing Window Before sta...

Страница 41: ...secured with two screws When replacing the tubes to the air pressure switch make sure that the red tube from the fan connects to the upper connection of the switch The polarity of the electrical conn...

Страница 42: ...HITE b BLUE bk BLACK br BROWN g y GREEN g GREY or ORANGE r RED y YELLOW p PURPLE YELLOW CHASSIS EARTH FUSED AT 2A PUMP E N L 230V 50Hz PERMANENT MAINS SUPPLY FUSED AT 3A KEY NOTE w w w bk bk b y g g b...

Страница 43: ...ated E27211 14 202226 Fuse not illustrated 278136 15 801182 Gas control valve E27124 16 227070 Air pressure switch assy 17 801186 Automatic air vent assembly E27166 18 801208 Safety valve assembly E27...

Страница 44: ...221895A Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions Diagram 15 1 7007a 15 Spare Parts 9 5 11 12 8 1 16 3 4 17 18 6 9 2 7 20 10 19...

Отзывы: