background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

48

IMPORTANT.

 

With regards to the Manual Handling Opera-

tions, 1992 Regulations, the following lift operation exceeds the 

recommended weight for a one man lift.

General recommendations when handling

Clear the route before attempting the lift.

Ensure safe lifting techniques are used – keep back straight – bend us-

ing legs. Keep load as close to body as possible. Do not twist – repo-

sition feet instead. If 2 persons performing lift, ensure co-ordinated 

movements during lift. Avoid upper body/top heavy bending - do not 

lean forward/sideways. Recommend wear suitable cut resistant gloves 

with good grip to protect against sharp edges and ensure good grip.

Always use assistance if required.

Removal of carton from delivery van

Recommend 2 person lift or 1 person with use of sack truck.  If 1 person 

is performing lift, straddle the load, tilt and place carton into posi-

tion on truck.  Recommend secure appliance onto truck with suitable 

straps.  Ensure safe lifting techniques are used – keep back straight 

– bend using legs. Keep load as close to body as possible.  If 2 persons 

performing lift, ensure co-ordinated movements during lift. Always use 

assistance if required.

Carriage of carton from point of delivery to point 

of installation – ground fl oor.

Recommend 2 person lift or 1 person with use of sack truck. If 1 person 

is performing lift, straddle the load, tilt and place carton into position on 

truck.  Recommend secure appliance onto truck with suitable straps.  

Ensure safe lifting techniques are used – keep back straight – bend 

using legs. Keep load as close to body as possible.  If 2 persons per-

forming lift, ensure co-ordinated

 

movements during lift.  Clear the route 

before attempting the lift.  If removing boiler from truck straddle the load 

and tilt forwards to facilitate secure grip.  Ensure safe lifting techniques 

are used – keep back straight – bend using legs.  Do not twist – repo-

sition feet instead.  Take care to

 

avoid trip hazards, slippery or wet 

surfaces and when climbing steps and stairs.  Always use assistance if 
required.

Carriage of carton from point of delivery to point 

of installation – fi rst or higher fl oor, cellar.

Recommend 2-person lift or 1 person with use of sack truck. If 1 person 

is performing lift, straddle the load, tilt and place carton into position on 

truck.  Recommend secure appliance onto truck with suitable straps.  

Ensure safe lifting techniques are used – keep back straight – bend us-

ing legs. Keep load as close to body as possible.  If 2 persons perform-

ing lift, ensure co-ordinated movements during lift. Avoid upper body/top 

heavy bending - do not lean forward/sideways.  Clear the route before 

attempting the lift.  If removing boiler from truck straddle the load and 

tilt forwards to facilitate secure grip. Ensure safe lifting techniques are 

used – keep back straight – bend using legs.  Do not twist – reposition 

feet instead.  Take care to avoid trip hazards, slippery or wet surfaces 

and when climbing steps and stairs.  Always use assistance if required.

Carriage of carton from point of delivery to point 

of installation – roofspace.

Recommend 2-person lift. Ensure co-ordinated movements during 

lift. Avoid upper body/top heavy bending - do not lean forward/side-

ways.  Clear the route before attempting the lift.  Take care to avoid trip 

hazards, slippery or wet surfaces and when climbing steps and stairs.  

When transferring appliance into roofspace, recommend 1 person to be 

in roofspace to receive the appliance and other person to be below to 

pass up and support appliance.  Ensure safe lifting techniques are used 

– keep back straight – bend using legs. Keep load as close to body as 

possible.  Always use assistance if required.  It is assumed safe access, 

fl ooring and adequate lighting are provided in the roof space.  It is 

recommended a risk assessment of the roof space area be carried out 

before moving the appliance into the area to take into account access, 

stability of fl ooring, lighting and other factors, and appropriate measures 
taken.

Unpacking of appliance from carton.

Recommend 2 persons unpack appliance from carton.  Always keep 

working area clear.  Recommend cut base end of carton and open car-

ton fl aps, then tilt boiler forwards from its side onto its base and remove 

carton by sliding up over the boiler. Ensure safe lifting techniques are 

16 Manual Handling

used – keep back straight – bend using legs.  Keep load as close 

to body as possible.  Always use assistance if required.  Dispose of 

packaging in a responsible manner.  Recommend wear suitable cut 

resistant gloves with good grip to protect against sharp edges and 

ensure good grip when handling appliance outside packaging.

Positioning of Appliance for Final Installation 

– no obstructions.

Recommend 2 persons lift appliance to position into place. Fit bracket 

securely onto wall before lifting appliance into position.  Obtain fi rm 

grip on front and sides of appliance, lift upwards, ensure stable bal-

ance achieved and lift upwards to position in place on bracket. Ensure 

safe lifting techniques are used – keep back straight – bend using 

legs - when lifting load from fl oor level.  Do not twist – reposition feet 

instead.  Keep boiler as close as possible to body throughout lift to 

minimise strain on back.  Ensure co-ordinated movements to ensure 

equal spread of weight of load.  Always use assistance if required.  

Recommend wear suitable cut resistant gloves with good grip to 

protect against sharp edges and ensure good grip when handling 
appliance.

 

Positioning  of  Appliance  for  Final  Installation 

– above worktop, foreseeable obstructions etc.

Recommend 2 persons lift appliance to position into place. Fit bracket 

securely onto wall before lifting appliance into position.  Obtain fi rm grip 

on front and sides of appliance, lift upwards, onto worktop if practicable.  

Ensure stable balance achieved and lift upwards to position in place on 

bracket. If 2 persons positioning onto bracket obtain fi rm grip at front 

and  sides/base  of  boiler.    Ensure  co-ordinated  movements  during  2 

person lifts to ensure equal spread of weight of load. Ensure safe lifting 

techniques are used – keep back straight – bend using legs - when lift-

ing load from fl oor level.  Do not twist – reposition feet instead.  Keep 

boiler as close as possible to body throughout lift to minimise strain on 

back.  Avoid upper body/top heavy bending - do not lean forward/side-

ways.  Always use assistance if required.  Recommend wear suitable 

cut resistant gloves with good grip to protect against sharp edges and 

ensure good grip when handling appliance.

Positioning of Appliance for Final Installation – 

within compartment etc. restricting installation.

Recommend 2 persons lift appliance to position into place, space per-

mitting.  Fit bracket securely onto wall before lifting appliance into po-

sition.  Obtain fi rm grip on front and sides of appliance, lift upwards, 

onto worktop if practicable.  Ensure stable balance achieved and lift 

upwards to drop into place onto bracket. If 2 persons positioning onto 

bracket obtain fi rm grip at front and sides/base of boiler.  Ensure co-

ordinated movements during 2 person lifts to ensure equal spread of 

weight of load.  If 1 person positioning onto bracket recommend obtain 

fi rm grip supporting base of boiler.  Ensure safe lifting techniques are 

used – keep back straight – bend using legs - when lifting load from 

fl oor level.  Do not twist – reposition feet instead.  Keep boiler as close 

as possible to body throughout lift to minimise strain on back.  Always 

use  assistance  if  required.    Recommend  wear  suitable  cut  resistant 

gloves with good grip to protect against sharp edges and ensure good 
grip when handling appliance.

 

Positioning  of  Appliance  for  Final  Installation 

– in roof space restricting installation.

Recommend 2 persons lift appliance to position into place, space per-

mitting.  Fit bracket securely onto wall before lifting appliance into po-

sition.  Obtain fi rm grip on front and sides of appliance, lift upwards, 

ensure  stable  balance  achieved  and  lift  upwards  to  drop  into  place 

onto bracket.  If 2 persons positioning onto bracket obtain fi rm grip at 

front and sides/base of boiler.  Ensure co-ordinated movements dur-

ing 2 person lifts to ensure equal spread of weight of load.  If 1 per-

son  positioning  onto  bracket  recommend  obtain  fi rm  grip  supporting 

base  of  boiler.    Ensure  safe  lifting  techniques  are  used  -  keep  back 

straight – bend using legs - when lifting load from fl oor level. Do not 

twist – reposition feet instead.  Keep boiler as close as possible to body 

throughout lift to minimise strain on back.  Always use assistance if re-

quired.  Recommend wear suitable cut resistant gloves with good grip 

to protect against sharp edges and ensure good grip when handling 

appliance.    It  is  recommended  a  risk  assessment  of  the  roof  space 

area be carried out before moving the appliance into the area to take 

into account access, stability of fl ooring, lighting and other factors, and 
appropriate measures taken

.

Содержание Betacom 24

Страница 1: ...0161 620 6677 1 INSTALLATION AND SERVICING High Ef ciency Combination Boilers Glow worm Nottingham Road Belper Derbyshire DE56 1JT www glow worm co uk 982 160116 000 07 06 Betacom Betacom 24 G C No 4...

Страница 2: ...tee We recommend you complete and return as soon as possible your Guarantee Registration Card If your guarantee registration card is missing you can obtain a copy or record your registration by teleph...

Страница 3: ...r Appliance Connection 7 19 Safety Discharge Valve and Condensate Connection 8 20 Flue Preparation and Installation 9 22 Electrical Connection 10 34 Commissioning 11 36 Servicing 12 40 Fault Finding 1...

Страница 4: ...ovide information on substances hazard ous to health The adhesives and sealants used in this appliance are cured and give no known hazard in this state Electrical Supply The boiler must be earthed All...

Страница 5: ...ntral heating sys tems Examples are Sentinel X100 Fernox Protector or Sala mander corrosion guard inhibitor Compartment or Cupboard Installations If the boiler is tted into a compartment or cupboard i...

Страница 6: ...an ice blockage by the use of warm cloths on the pipe The boiler should then restart Contact your installa tion servicing company if the fault persists Maintenance and Servicing Maintenance and Servic...

Страница 7: ...lding Regulations Northern Ireland The Water Fittings Regulations or Water byelaws in Scotland The Health and Safety at Work Act Control of Substances Haz ardous to Health COSHH The Current I E E Wiri...

Страница 8: ...ng kW 21 08 28 4 17 76 32 74 Heat input Hs DHW kW 11 65 28 4 13 3 32 74 Maximum hot water temperature C 83 83 Heating Heating temperature range C 35 78 35 78 Expansion vessel useful capacity l 8 8 Exp...

Страница 9: ...2 1 4 6 4 6 10 34120 2 3 5 0 5 1 11 37532 2 7 6 1 6 2 12 40944 3 2 7 2 7 5 13 44356 3 7 8 4 8 9 14 47768 4 3 9 7 10 4 15 51180 4 9 11 1 12 1 16 54592 5 5 12 5 13 9 17 58004 6 1 14 1 15 9 18 61416 6 8...

Страница 10: ...Supplied By www heating spares co Tel 0161 620 6677 10...

Страница 11: ...w discharge of conden sate to a drain Condensate should if possible be discharged into the internal household draining system If this is not practical discharge can be made externally into the househo...

Страница 12: ...e positioned so that at least the minimum operational and servicing clearances are provided see dia gram 2 1 Additional clearances may be bene cial around the boiler for installation and servicing For...

Страница 13: ...0 Plume Management Kit basic set white concentric ue 60 100 Part No A2044100 1m extension white Part No A2044300 87o elbow white Part No A2044700 45o bend 2 white Part No A2044500 Plume Management Kit...

Страница 14: ...e of air across it at all times Being a condensing boiler some pluming may occur from the ue outlet This should be taken into consideration when se lecting the position for the terminal NOTE If necess...

Страница 15: ...section 11 6 The installation of the boiler must comply with the requirements of the current issue of BS6798 in Ireland refer also to the cur rent edition of I S 813 Domestic Gas Installations In GB...

Страница 16: ...Remaining conveyancing capacity Model Betacom 24 with pump s selector in speed position I II III automatic by pass not disconnectable Remaining conveyancing capacity Model Betacom 30 with pump s sele...

Страница 17: ...ended that the hot wa ter setting is reduced and that a scale reducer is tted Refer to the manufacturer s instructions or consult the local wa ter company for additional advice 5 3 Domestic Water Flow...

Страница 18: ...heating spares co Tel 0161 620 6677 18 6 Installation Preparation Diagram 6 1 Pipe pack A Central Heating 2 B Domestic Water outlet C Domestic Water inlet D Gas Safety discharge valve pipe not illust...

Страница 19: ...ended weight for a one man lift refer to section 16 Manual Handling NOTE The appliance may contain a small amount of water place a water container beneath the boiler connections Lifting the boiler int...

Страница 20: ...o use a compression type tting to extend the safety discharge valve tube 8 2 Condensate Drain Connection The condensate drain connection is at the rear of the boiler see diagram 7 1 A exible condensat...

Страница 21: ...FROM APPLIANCE EXTERNAL LENGTH OF PIPE 3M MAX 25mm MIN SEAL BOTTOM OF TUBE SEALED 100mm PLASTIC TUBE 300mm MIN GROUND either or 500mm MIN HOLE DEPTH 400mm MIN LIMESTONE CHIPPINGS 2 ROWS OF 3 x 12mm H...

Страница 22: ...ble then a Top horizontal rear ue standard MUST be used and cut to length 9 4 Flue Fitting Set the ue to the required length Y ensure the air duct seams line up Remove the ue elbow Mark the securing h...

Страница 23: ...s fall to the boiler of at least 44mm metre 2 5 to allow condensate to run back into the boiler and out via the drain Temporarily t the ue elbow measure the distance from the outside wall to ue elbow...

Страница 24: ...bow in position on top of the boiler with four torque headed screws supplied Draw the ue assembly from wall and engage the ue duct into the elbow and butt t between the air duct and ue elbow Ensuring...

Страница 25: ...e the ue elbow Mark the securing hole position in the air duct Drill a 3mm diameter hole at this position take care not to pierce the inner ue duct Secure with screw provided and tape the joint see di...

Страница 26: ...lation do not use mineral oils or grease silicon grease or water is recommended Fit the sealing collar behind the locating lugs on the ue termi nal see diagram 9 6 Push the ue assembly into the wall e...

Страница 27: ...d with four screws see diagram 9 2 Refer to diagram 9 18 Secure the ue adapter in position on top of the boiler with four torx headed screws supplied mak ing sure the nib ts into the locating slot in...

Страница 28: ...roof the length of the nal pipe can be determined If a telescopic length cannot be used then a standard ue length can be cut to make the correct length Cut the ue to the desired length measuring from...

Страница 29: ...21 12983 9 Flue Preparation and Installation When the length of the ue system is less than 2 metres it is necessary to install the ue restrictor D The length of the system is speci ed for each ue con...

Страница 30: ...me wall or 1200mm from an op posing ue outlet Installation Details The parts available for a twin ue system installation are shown in diagram 9 23 Boiler Connection Remove the top ue outlet cover secu...

Страница 31: ...t the pipe s from the boiler to the terminal s the length of the nal pipe piece can be determined Cut pipes at the opposite end to the O ring seal making square and free from burrs Push the horizontal...

Страница 32: ...n and Installation Diagram 9 25 When the length of the ue sys tem is less than 4 metres it is necessary to install the ue re strictor D The length of the system is speci ed for each ue con guration Re...

Страница 33: ...doors opening windows and air bricks see diagram 9 26 The maximum length of the Plume Management Kit must NOT exceed 6m with a horizontal concentric ue length of 2m max For each 90 bend or 2 x 45 bend...

Страница 34: ...used three pin plug and shuttered socket outlet may be used instead of a fused spur box provided that a They are not used in a room containing a xed bath or show er b Both the plug and socket comply w...

Страница 35: ...617B_R01 PROGRAMMABLE ROOM THERMOSTAT 1 INTERNAL TIME CLOCK WITH EXTERNAL ROOM THERMOSTAT If a room thermostat is required it must be connected to the external controls lead as shown using a suitable...

Страница 36: ...the lling loop in compliance with the water regulations 11 2 Filling Domestic Water Circuit 1 Fully open any valves in the domestic water supply to the boiler 2 Open the domestic water isolation valve...

Страница 37: ...ce reaches its operating temperature during the measurement The approximate gas rates Betacom 24 2 7m h Betacom 30 3 1m h The gas valve is factory set for natural gas G20 and should need no adjustment...

Страница 38: ...to the burner and turn the Central Heating knob along the heating system temperature scale until you read on the manometer the burner pressure corresponding to the power needed do NOT move the Centra...

Страница 39: ...and Use Regulations Section 35 which imposes a duty of care on all persons who let out any property containing a gas appliance in the UK The user shall not interfere with or adjust sealed components I...

Страница 40: ...analyser test point on the ue elbow refer Combustion Check IMPORTANT NOTE Products of combustion will be dis charged when the cap is removed It is important to replace the cap immediately 12 1 Combus...

Страница 41: ...ny servicing of gas carrying components AL WAYS test for gas soundness and carry out a functional test of the controls 12 3 Burner Refer to Diagram 12 4 Undo main gas supply nut from burner Pull main...

Страница 42: ...on electrode 10 Electronic igniter 11 Safety valve 3 bar 12 Gas valve 13 Domestic plate to plate heat exchanger 14 Priority pressure switch 15 Hydraulic 3 way valve 16 DHW temperature sensor 17 Conden...

Страница 43: ...heck for gas soundness after any service work Electrical Testing Should there be any doubt about the voltage supply to any of the components it is possible to carry out a simple electrical test Import...

Страница 44: ...n motor PSA Low water pressure switch N O contact closed in pressure SR NTC sensor heating SS NTC sensor DHW TA Voltage free Contact for generic Room Thermostat or Cronothermostat safety extra low vol...

Страница 45: ...2 Draining of Boiler Heating Circuit Drain down the Heating Circuit of the boiler only by closing the heating ow and return isolating valves Attach a length of hose to the drain point and open the dr...

Страница 46: ...Supplied By www heating spares co Tel 0161 620 6677 46 Diagram 14 3 14 Replacement of Parts...

Страница 47: ...Supplied By www heating spares co Tel 0161 620 6677 47 15 Spare Parts Diagram 15 1...

Страница 48: ...straight bend using legs Keep load as close to body as possible Always use assistance if required Dispose of packaging in a responsible manner Recommend wear suitable cut resistant gloves with good g...

Страница 49: ...Supplied By www heating spares co Tel 0161 620 6677 Installation Commissioning and Service Record...

Страница 50: ...Supplied By www heating spares co Tel 0161 620 6677 982790002 000...

Страница 51: ...Supplied By www heating spares co Tel 0161 620 6677...

Страница 52: ...ing spares co Tel 0161 620 6677 Because of our constant endeavour for improvement details may vary slightly from those shown in these instructions Glow worm Nottingham Road Belper Derbyshire DE56 1JT...

Отзывы: