
Supplied By www.heating spares.co Tel. 0161 620 6677
25
221473B
11 Commissioning
Diagram 11.5
6524
CATCH
ASSEMBLY
BRACKET
SECURING
SCREW
HINGE PIN
HINGE PIN
RETAINING
BRACKET
SECURING NUT
PLASTIC BUSH (2)
HINGE PIN
PLASTIC COVERS
COVER
PLATE
NUT &
WASHER(2)
OUTER CASE
SECURING
SCREWS (4)
SCREW (2)
11.10 Completion
The user control door is designed for left or right hand hinging.
If required the hinge can be moved to the other side to that
supplied, as follows:
Remove the hinge pin bracket securing screw then remove the
hinge pin retaining bracket and, holding the door, remove the
hinge pin. Prise out the hinge pin bushes and fit on to the
opposite side of the door, see diagram 11.5.
Remove the screw and nut and fit to the opposite side of the
case. After removing the other hinge pin retaining bracket refit
the door and hinge pin. Refit the hinge pin retaining bracket and
fit the securing screw.
Fit the catch assembly, supplied on the loose items pack, see
diagram 11.5.
If required, fit the plastic covers to hide the bracket securing
screw.
Change the position of the “Push” label to suit new door opening.
Clock/timer, if fitted, remove the screws, nuts and washers to
release the cover plate, see diagram 11.5.
Stick the casing label to the right hand side of the clock/timer.
Fit the outer case, secure with the four screws, see diagram
11.5.
Note: Secure with the two outer screws only if there is no clock/
timer fitted.
Set the boiler and any remote heating control to the desired
settings, then close the door.
11.11 Instruct the User
Instruct and demonstrate the lighting procedure and advise the
user on the safe and efficient operation of the boiler.
Instruct on and demonstrate the operation of any heating
system controls.
Advise the user on the use and maintenance of any scale
reducer and pass on any relevant instructional documents.
Advise that to ensure the continued efficient and safe operation
of the boiler it is recommended that it is checked and serviced
at regular intervals. The frequency of servicing will depend upon
the installation conditions and usage, but in general, once a year
should be enough.
Draw attention, if applicable, to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance.
It is the Law that any servicing is carried out by a competent
person.
Advise the user of the precautions necessary to prevent damage
to the system, boiler and the building, in the event of the heating
system being out of use during frost or freezing conditions.
Reminder - Leave these instructions with the user.
Because of our constant endeavour for improvement details
may vary slightly from those given in these instructions.