Remove the rain shroud (if the TEG c/w a rain shroud), the fin duct front cover, the drip cap (if
the TEG c/w a drip cap). With a suitable lifting device and the Lifting Lug (shown in Figure 6),
gently lift and move the TEG to place. When the TEG has been mounted on the stand, proceed
with a complete mechanical inspection.
1 .11 Mechanical Inspection (see Figure 6)
Ensure the exhaust flame arrestor assembly is screwed tight to the exhaust stack, and all
screws on the flame arrestor assembly are tight. Visually inspect the flame arrestor element by
looking down the exhaust pipe to ensure that there is no visual damage or fractures. Replace
the drip cap (if the TEG c/w a drip cap), the fin duct front cover, the rain shroud (if the TEG c/w
a rain shroud).
Open the front doors of the cabinet and locate the burner mounting bolts, tighten the cap nuts,
and locate the air intake flame arrestor assemblies. Ensure that they are tightly secured.
Locate the Igniter housing assembly, remove the cap and visually inspect the ignitor connec-
tions, re-installing the cap securely. Check that all conduit connections are secure and the
mountings are tight.
Locate the fuel system assembly and ensure that all the connections are tight.
Check that all hardware and mountings are secure and tighten as necessary. When the
mechanical inspection is complete, proceed to electrical connection.
Figure 5
TEG Mounting
10