background image

1.

 

Create the right side of the shelving units by laying two uprights side-by-side on a flat surface.

Be sure that the short side of the uprights is facing up, as shown in Figure 1. 

Important: One side of the uprights

is longer that the other, and contains

two sets of holes. When laying the

uprights side-by-side, this long side

should be on the floor, and the short

side should be facing up.

2.

 Attach the two side sway braces, beginning in the 20th

hole from the top of each upright (approximately 20"  from the top),

using two 

1

/

4

"-20 x 

5

/

8

" bolts and nuts. The side sway braces attach

to the longer side of the uprights (the side with two sets of holes). Bolt

the braces into the small holes near the edge of the uprights as shown.

Note the hole pattern of two round holes and then one square hole,

repeating every 3", which should help facilitate proper placement of the

bolts. Finger tighten only at this point.

3. 

Attach the other end of both sway braces. The information below will

tell how many holes should be between the top and bottom of the sway braces.

Count the holes carefully, as an incorrect count will cause the upright to be the

wrong depth to hold the shelves.

  

 

4. 

Repeat steps 1-4 for the left uprights.

Tools Required:

• 

7

/

16

" nut driver or socket

• Flathead screwdriver. 

• Requires two people 

  for assembly. 

• Approximate assembly time:

  15 to 30 minutes per unit.

Note: Number of shelves 

per unit varies depending 

on unit purchased.

OPEN INDUSTRIAL SHELVING

Assembly

Instructions

Customer Service

1-800-645-2986

1

Starter

Starter & Add On

Back-To-Back

Unit Depth    Brace Length   Distance Between Bolts

      12

"

                30

"

 

     27 holes (27 

1

/

2

"

)

      18

"

                30

"

       

     24 holes (24 

1

/

2

"

)

      24

"

                30

"

 

     19 holes (19 

1

/

2

"

)

      30

"

                30

"

 

     10 holes (10 

1

/

2

"

)

Содержание Starter

Страница 1: ...pattern of two round holes and then one square hole repeating every 3 which should help facilitate proper placement of the bolts Finger tighten only at this point 3 Attach the other end of both sway braces The information below will tell how many holes should be between the top and bottom of the sway braces Count the holes carefully as an incorrect count will cause the upright to be the wrong dept...

Страница 2: ...ves depending upon placement could possibly require temporary removal of one end of a sway brace in order to insert the shelf 10 Tighten all bolts and nuts on the rear and side sway braces 8 While unit is still lying down bolt the rear sway braces on the back of the unit using five 1 4 20 x 5 8 bolts and nuts as shown Again the top of the sway braces should be in the 20th hole from the top of each...

Страница 3: ...uts not included through each corner of each shelf and into the small holes of the upright 12 If more than one unit is to be used in a row assemble a new unit with 1 4 20 x 1 bolts and nuts The pair of side braces on the first unit becomes a common pair for the two units A B C ...

Страница 4: ...ottom of shelf Place on an angle and turn into shelf channels as pictured above 13 If two units are to be placed back to back the back braces on the first unit become a common pair for the two units 1 800 645 1232 Customer Service 1 800 645 2986 A B 1a One Channel Two Channel Three Channel ...

Отзывы: