background image

 

 

 

 

 

                                                                                                                                                                                                                                             

 

 

 

 

 

User manual 

- 6 -

 

Global Gravity ApS ● Lillebæltsvej 37 ● DK 6715 Esbjerg N ● CVR: 33950705

 

Rev. 02 

 

www.globalgravity.dk    

 

 

Layout 

4.1  Package assembly 

 

 

Standard assembly 
Includes 3 sets of profiles  

 

Optional assembly 
Includes 4 sets of profiles  

 

Содержание TubeLock

Страница 1: ...TubeLock MJN KSH VCS KSH Rev Date Description Prepared by Checked by QA Approval Final Approval Document no Global Gravity User manual Global Gravity TubeLock User manual Responsible KSH Global Gravi...

Страница 2: ...pose 3 1 3 Contact 3 2 Personal protective equipment recommended by Global Gravity 4 3 System data 5 4 Layout 6 4 1 Package assembly 6 4 2 Packing configuration Empty spaces 7 4 3 Packing configuratio...

Страница 3: ...led OCTG Oil Country Tubular Goods This system is designed for use with Forklift Lorry Vessels Cranes Drilling rigs 1 2 Purpose The purpose of instruction manual is to ensure that the TubeLock will be...

Страница 4: ...tem Description PPE 01 Safety helmet during crane handling due to Falling objects Personal hazards Mechanical hazards 02 According to local regulation 03 According to local regulation 04 Fall protecti...

Страница 5: ...ing Range 1 3 SWL 6 0 ton Load test 2 x SWL DNV certification DNVGL ST 0378 CE marked Yes Slings standard Wire sling EN13414 1 Chain sling EN 818 4 Lifting poles System with 3 frames 3 left 3 right pa...

Страница 6: ...lobal Gravity ApS Lilleb ltsvej 37 DK 6715 Esbjerg N CVR 33950705 Rev 02 www globalgravity dk 4 Layout 4 1 Package assembly Standard assembly Includes 3 sets of profiles Optional assembly Includes 4 s...

Страница 7: ...algravity dk 4 2 Packing configuration Empty spaces There must always be at least one pipe in each side per layer in the position closest to lifting poles Pipes A B must be in full length and go throu...

Страница 8: ...n each side per layer in the position closest to lifting poles Securing of short pipes Extra frames must be placed where it is necessary The weight of additional frames and pipes must be placed even o...

Страница 9: ...manual 9 Global Gravity ApS Lilleb ltsvej 37 DK 6715 Esbjerg N CVR 33950705 Rev 02 www globalgravity dk 4 4 Exploded view Lifting pole Left Anchor lock Sling Lifting profile M20 Bolts Lifting pole Ri...

Страница 10: ...pole Left Lifting pole Lifting profile M20 Bolt Sling System with 3 frames System with 4 frames System with 3 frames System with 4 frames System with 3 frames System with 4 frames System with 3 frame...

Страница 11: ...d on a plan surface with a distance between 7m and 9m between the two outermost profiles Alternatively the system can be assembled on a standard TubeLock assembly frame Not described in this instructi...

Страница 12: ...05 Ensure that all threaded holes are in activated position 2 holes for each profile Total 6 pcs A 06 Tubular must be placed on the TubeLock profiles Ensure that the tubular is located correct in the...

Страница 13: ...3950705 Rev 02 www globalgravity dk No Description Sketch A 07 3 TubeLock profiles must be installed on the top of the tubular A 08 6 assembling bolts must be mounted between the bottom and the top Tu...

Страница 14: ...705 Rev 02 www globalgravity dk No Description Sketch A 09 Anchor lock 1 Put the anchor lock through the keyhole 2 Turn the anchor lock 90 deg 3 Put the safety pin through the hole in the anchor lock...

Страница 15: ...www globalgravity dk No Description Sketch A 11 Next layer of tubular can now be laid out according to A 07 etc A 12 When the tubular is packed and secured in one package the tubular is ready for sta...

Страница 16: ...B 01 When mounting slings Always use the most outer lifting poles Closest to the tubular ends Ensure that shackles are locked and pins are mounted Note Always mount the shackle so the nut and safety...

Страница 17: ...o the same side as shown on sketch 2 The next package can be stacked with the slings located to the other side as shown on sketch 3 The next package can be stacked with the slings located to the same...

Страница 18: ...king of TubeLock system seen from the side The principle is to offset each package Once placed the first layer the next layer must be offset to the side and hereafter back again C 02 Top view When pla...

Страница 19: ...g pole and the next pipe This distance makes it possible for free movement of lifting poles and to ensure that the package can be stacked with the earlier explained method C 04 It s important to place...

Страница 20: ...5 Once the packages are set according to above recommendations it is possible to walk on top of the tubular and start to dismantle the packages working from the top down Remove sling and shackles Loos...

Страница 21: ...ways be checked before use and at least once a year by an competent person approved by Global Gravity On delivery TubeLock is approved for lifting use Approval mark indicating last inspection month ca...

Страница 22: ...05 Rev 02 www globalgravity dk 9 Handling No Description Sketch D 01 To prevent accidents to fingers we recommend using the TubeLock 7 D 02 TubeLock 7 is ideal for handling lifting scepters Unlock lif...

Страница 23: ...al Gravity ApS Lilleb ltsvej 37 DK 6715 Esbjerg N CVR 33950705 Rev 02 www globalgravity dk No Description Sketch D 03 2x TubeLock 7 can be used for ergonomic changing of profiles Moving TubeLock Profi...

Страница 24: ...User manual 8 Global Gravity ApS Lilleb ltsvej 37 DK 6715 Esbjerg N CVR 33950705 Rev 02 www globalgravity dk...

Отзывы: