N...92
WORKSHOP MANUAL
REMOVAL OF THE ENGINE
5.5
0
2 / 2
page
from
2007
to
••••
Having identified the screws fixing the engine to the
chassis, grasp the former firmly and lift it with due
care, remembering that it weighs about 35-45 kg.
N.B.
Some types of engine can be fixed with screws of a
different length and in a different position, so it is
advisable to mark them, to prevent errors on
reassembly.
For reassembly follow the operations described
above in reverse.
Ensure that the pin
(12)
is inserted in the groove in
the clutch
(2)
and remember to replace the spring
(4)
.
Fully tighten the engine and pulley fixing screws to
the prescribed values.
Remember to replace the fuel pipe fastening
clamps and
check that there are no leaks
.
Carefully restore all electric and earth contacts and
always refit the exhaust guard
(8)
.
Refit the accelerator cable and...
Adjust the “TICK-OVER” position [see 6.8].
Refit the front bonnet [see 5.1].
➤
In hydrostatic transmission models:
restore
the tension in the tension regulator spring if it has
slackened off [see 4.3].
Tightening torques
5
Screw for pulley ............................... 45 ÷ 50 Nm
–
Screws for engine fastening ............. 25 ÷ 30 Nm
4/2007
12
2
11
9
10
© by GLOBAL GARDEN PRODUCTS
<= ...BACK... <=
Содержание N 92 Hydro Series
Страница 1: ......