
Section 1.0 — Installing the EEC4
1
1.0 Installing the EEC4
The installation process includes the following six steps:
STEP 1: Pre-installation planning (the most important part of the process)
STEP 2: Mount the EEC4 Control Processor
STEP 3: Control Head(s) Installation
STEP 4: Station Communication Cable Routing
STEP 5: Engine Compartment Wiring
STEP 6: Operational Test
1.1 Pre-Installation Planning
Before beginning the installation of the Glendinning EEC4 System, it is very important that some
thought be given to the overall installation. The following should be considered:
— Control Processor location
— Power / Battery supply
— Station Communication Cable routing
STB
DE
ngine
POR
TEngi
ne
Circuit
Break
er
Circuit
Break
er
Batte
ry
#1
Battery
#2
+
+
-
-
DCPo
werHarness
StationC
able
T
oStartInterlockCntr
.
MainHelmStation
Bondsyst
em
toveselbond
per
ABYCs
pes.
Terminating
Resistor
Batteriesmusthave
acommonground
T
oThrottleCntr
.
GearHarness
Engine
Harne
ss 20
'
Station
STBDThrottle
POR
T
Throttle
STBDGear
POR
T
Gear
DCPWR
Bond
EngineH
arness
20'
Terminating
Resistor
T
oIgn.SwitchCntr
.
TopMountControl
GearHarness
ExistingJumper
inenginecntr.
T
oStartInterlockCntr
.
T
oThrottleCntr
.
T
oIgn.SwitchCntr
.
ExistingJumper
inenginecntr.
Installation Preview
For a larger version of this drawing
see Appendix (sec. 2.0, pg.17)
Содержание EEC4
Страница 20: ...EEC4 Installation Manual 16...
Страница 26: ...EEC4 Installation Manual 22...
Страница 27: ...23 Section 2 0 Appendix Reference 3 25 Cutout Template for Control Head Top Mount...
Страница 28: ...EEC4 Installation Manual 24...