background image

Page 26

TERMS AND C

ONDITIONS

Gledhill

 (Building Products) 

Ltd

  

AMD. SEPTEMBER 2010

 

 

CONDITIONS OF SALE & GUARANTEE TERMS

1.

 

Gledhill (Building Products) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear 

below and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us 
to the exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and 
Warranty Terms override those which are contained on the Invoice Forms and all Sales are now subject to these 
Conditions of Sale and Warranty terms only.

2. PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3. SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with our 
printed literature or the literature of any of our component suppliers (subject to any modifications made since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4. PAYMENT

The buyer shall make payment in full within thirty days from the end of the month in which the invoice is dated.  If 
we receive payment in full on or before the due date we will allow an appropriate settlement discount except where 
we have quoted a special net price.  If payment is not received in full on or before the due date we shall be entitled 
in addition to the invoice price to:
(i) 

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 

(ii) 

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5. TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6. DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk 
and expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had 
been despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7. 

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8. 

RETURN OF GOODS

Goods may not be returned to the Company except by prior written permission of an authorised officer of the 
Company and such return shall be subject to payment by the Purchaser of handling and re-stocking charges, 
transport and all other costs incurred by the Company.

9. 

COMPANY LIABILITY AND GUARANTEE

9.1.  Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2.  Each Guarantee is strictly conditional upon the following:-
9.2.1.  Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2.  The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3.  All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4.  The unit has only been used for the storage of potable water supplied from the public mains.
9.2.5  Where appropriate the unit has been regularly maintained as detailed in the installation and service instructions 
9.2.6.  Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7.  Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.2.8. We will not accept any labour charges associated with replacing the unit or parts for any of the following 

products listed.

9.3.  Guarantees are provided in respect of specified goods supplied by Gledhills as follows:- 

(a)  Domestic and Commercial Open Vented Cylinders and Tanks.

 

The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.

  (i)    free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b)  Domestic Mains Fed Products [Primary Stores]

 

The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel assembly proves to be defective either in materials or workmanship, we reserve the right to either 
repair or supply replacements or the closest possible substitute in the case of any obsolete product and will 
collect and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).

  (i)  free of all charge during the first year after delivery by us.
  (ii)  thereafter at a charge of one-fifth of the then current list price or any copper price supplement and 

delivery charge during the second year after delivery by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

 

(c)  Stainless Steel Unvented Cylinders

 

Gledhill guarantee the components including 
controls, valves and electrical parts for two years from 
the date of purchase.  IT SHOULD BE NOTED THAT 
THE FACTORY FITTED TEMPERATURE AND PRESSURE 
RELIEF VALVE MUST NOT BE REMOVED OR ALTERED 
IN ANY WAY OR THE GUARANTEE WILL NOT BE VALID.  
GLEDHILL WILL NOT BE RESPONSIBLE FOR ANY 
CONSEQUENTIAL LOSS OR DAMAGE HOWEVER IT IS 
CAUSED. 

 

The guarantee for the stainless steel vessel is for 
twenty five years if the original unit is returned to us 
AND PROVIDED THAT:   

  (i)  It has not been modified, other than by Gledhill.
  (ii)  It has not been subjected to wrong or improper 

use or left uncared for.

  (iii) It has only been used for the storage of potable 

water, max 200mg/litre chloride.

  (iv)  It has not been subjected to frost damage.
  (v)  The benchmark log book is completed after each 

annual service.

  (vi)  The unit has been serviced annually.
  (vii) Any disinfection has been carried out strictly in 

accordance with BS6700.

 

If the stainless steel vessel proves to be defective 
either in materials or workmanship we reserve the 
right to either repair or supply replacements or the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):

 (i) free of charge during the first year after delivery by 

us.

  (ii)  thereafter at a charge of one twenty fifth of the 

then current list price during the second year 
after delivery by us and increasing by a further 
one twenty fifth on the second and subsequent 
anniversary of delivery by us.

 

ACTION IN THE EVENT OF FAILURE  

 

If the stainless steel cylinder develops a leak we will 
ask for a deposit against the supply of a new one.  This 
will be refunded if the failure is within the terms of the 
warranty when it has been examined by us.

Please note:

  -    Installation must have been carried out by a 

licensed specialized company (heating contractor 
or plumber) following the version of installation 
instructions in force.

  - 

  Gledhill or its representative was given the 

opportunity to check complaints on site 
immediately after any defect occurred.

 - 

  Confirmation exists that the system was 

commissioned properly and  that the system 
was checked and maintenance was performed 
annually by a specialised company licensed for 
this purpose.

(d) Components of our products other than 
Storage Vessels and Integral Pipework.  

 

We will either extend to the purchaser the same terms 
of warranty as we are given by the manufacturer of 
the component or if the manufacturer does not give 
any warranty, replace free of charge any component 
which becomes defective within two years after the 
date of the delivery by us and is returned to us at the 
purchaser’s expense but we shall not meet the cost of 
removal or shipping or return of the component or 
any other cost charges or damages incurred by the 
purchaser.

9.4. 
9.4.1. In respect of goods supplied by us  and in respect of 

any installation work carried out by or on our behalf, 
our entire liability and the purchaser’s sole remedies 
(subject to the Guarantees) shall be as follows:-

  (a)  We accept liability for death or personal injury to 

the extent that it results from our negligence or 
that of our employees

  (b)  Subject to the other provisions of this clause 9 

we accept liability for direct physical damage 
to tangible property to the extent that such 
damage is caused by our negligence or that of our 
employees, agents or subcontractors.

Содержание BMBP125

Страница 1: ...oilerMate BMBP 145 BoilerMate BMBP 185 BoilerMate BMBP 215 BoilerMate BMBP 225 All models comply with the Hot Water Association specification for thermal stores For a sealed or an open vented central heating and mains pressure hot water supply system incorporating a thermal store ...

Страница 2: ...eme as an option to notifying the Local Authority directly Similar arrangements will follow for Scotland and will apply in Northern Ireland from 1st January 06 CORGI operates a Self Certification Scheme for gas heating appliances These arrangements represent a change from the situation whereby compliance with theBuildingRegulationswasacceptediftheBenchmarkLogbookwascompletedand this was then left ...

Страница 3: ...ners or Consultants concerned with the design and installation Please Note We do not therefore accept any responsibility for matters of design selection or specification or for the effectiveness of an installation containing one of our products unless we have been specifically requested to do so All goods are sold subject to our Conditions of Sale and Warranty Terms which are set out at the rear o...

Страница 4: ...mary heat exchanger flow C4 Primary heat exchanger return C5 Open vent C6 Cold feed C7 Drain C8 Immersion heater boss All the connections are also labelled on the appliance It is essential that the pipework is connected to the correct connection Note The safety open vent and cold feed expansion must be connected to the F E cisternusingthepipeworkassemblyprovided Do not alter or connect any pressur...

Страница 5: ...onnections 22mm 22mm 22mm 28mm 28mm MCW DHW pipe connections 22mm 22mm 22mm 22mm 22mm Cold feed expansion connection 15mm 15mm 15mm 15mm 22mm Safety open vent connection 22mm 22mm 22mm 22mm 22mm Drain connection R R R R R Maximum Head Thermal Store 6 meters 6 meters 6 meters 6 meters 6 meters Maximum pressure heating circuit 3 bar 3 bar 3 bar 3 bar 3 bar Volume of primary heat exchanger 4 9 litres...

Страница 6: ...Dimensions Model Height D Width E Depth F BMBP 125 2012 680 600 BMBP 145 2012 680 600 BMBP 185 2173 680 600 BMBP 215 2334 680 600 BMBP 225 2534 680 600 Note The Appliance dimensions above do not allow for the100mm high installation base The following table of minimum cupboard dimensions only allow the minimum space requiredfortheappliance includingthetopup cistern Any extra space required for shel...

Страница 7: ...pass valve 4 Manual air vent 5 3 port mid position valve 6 Wiring centre Note All components to be supplied by the installer Example installation of an S plan system 1 Pump 2 Storethermostat 3 Bypass valve 4 Manual air vent 5 Central heating zone valve 6 Hot water zone valve 7 Wiring centre Note All components to be supplied by the installer ...

Страница 8: ...approximate and subject to a tolerance of 10mm in any direction Space will also be required for a 15mm cold water supply and a 22mm warning overflow pipe Note All dimensions are shown in mm and are to the centre line of pipework Connection Details Dimensions For Top Of Unit Figure 5 570 595 including the door clock 580 58 117 370 Cold Feed Expansion 330 Open Vent Connection Details Dimensions For ...

Страница 9: ... s 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 Pressure loss mWG 6 5 4 3 2 1 0 BMBP125 BMBP145 BMBP225 BMBP185 BMBP215 Figure 6 Pressure drop across the DHW heat exchanger DHW flow rate l min 5 10 15 20 25 30 Pressure loss bar 4 0 3 5 3 0 2 5 2 0 1 5 1 0 0 5 0 BMBP125 BMBP145 BMBP185 BMBP215 BMBP225 Figure 7 ...

Страница 10: ...actoryfittedin linescaleinhibitorshouldbe specified at the time of order for hardness levels between 200 and 300 ppm mg l Wherethewaterisveryhardie300ppm mg l andabovethe optionalpolyphosphate type inhibitor should be specified at the time of order However this will need to be fitted by the installer at a suitable point in the cold water supply to the appliance If scale should ever become a proble...

Страница 11: ... system is chosen the manufacturer confirms that the design criteria of the new system is at least equivalent to the use of BS EN Standard copper pipework and fittings Taps Shower Fittings Aerated taps are recommended to prevent splashing Any type of shower mixing valve can be used as long as both the hot and cold supplies are mains fed However all mains pressure systems are subject to dynamicchan...

Страница 12: ... designed to be installed with condensing or non condensing oil or gas boiler which is capable of delivering hot water at a minimum temperature of 80 C The boiler must be set to operate at nominal 82 C flow which usually corresponds to maximum boiler control thermostat setting It is recommended that an automatic bypass is fitted to compensate for pressure and hence the flow rate changes in the hea...

Страница 13: ...teBP i e the maximum static pressure in the store must not exceed 0 6bar The primary pipework connecting the boiler the thermal store and central heating system should be sized to achieve either 11 C rise across the boiler or the maximum temperature rise specified by the boiler manufacturer which ever is smaller But in any case should not be less than 22mm copper tube or equivalent The pressure lo...

Страница 14: ...A boiler used in a sealed heating system must be suitable for this application i e must be fitted with an overheat cut out thermostat It is recommended that the F E cistern for the store is fitted at a high level in the same cupboard as the BoilerMate BP However it can be fitted remotely up to 6m above the base of the BoilerMate BP The F E cistern overflow warning pipe should be installed in a mat...

Страница 15: ...d on a material which will not easily deteriorate if exposed to moisture The floor of the cupboard needs to be level and even and capable of supporting the weight of the appliance when full Details of the weight when full is provided in the Technical Data section The appliance is designed to operate as quietly as practicable However some noise from pumps etc is inevitable in any heating system Thi...

Страница 16: ...ntsforelectricalInstallationsBS7671 2 The electrical mains supply needs to be 230V 50Hz 3 A means for disconnection from the supply mains having a contact separation in all poles that provides full disconnection under over voltage category III conditions must be incorporated in the fixed wiring in accordance with the wiring rules This shall be located within 1m of the appliance and only serve the ...

Страница 17: ...yforconnection ofthepipeworkandelectricalsupplies Thefeed andexpansioncisternsupportshallbeinstalled ensuringthatthebaseisfullysupportedandthe working head of the appliance is not exceeded and the recommended access is provided for maintenance see the Technical Data section For further information on manual handling See Appendix Note Althoughtheaboveguidanceisprovided any manual handling lifting o...

Страница 18: ...BoilerMate BP appliance Obviously if installed in the roof space the feed and expansion cistern and any pipework will need to be adequately insulated to protect against frost damage If the automatic fill version appliance is used the overflow warning pipe shall have a continuous fall be fitted to discharge clear of the building and be sited so that any Overflow can be easily observed It shall also...

Страница 19: ...oughtheBoilerMateBPhasnospecialwatertreatmentrequirements theradiators and other parts of the circuit will benefit from the application of a scale and corrosion inhibitor such as Sentinel X100 or a Protector such as Fernox MB1 Thevolumes concentrationshouldbecalculatedinaccordancewiththemanufacturers instructions allowing the volume for the primary coil shown in the Table in the Technical Data sec...

Страница 20: ...pework in the BoilerMate BP cupboard DO plumb the overflow warning pipe if fitted in a 20mm internal diameter pipe material which is suitable for use with a heating F E cistern in accordance with BS 5449 such as copper and ensure it has a continuous fall and discharges in a conspicuous external position DO check that the primary system pressure does not exceed 2 bar when the whole of the system is...

Страница 21: ...k Code 1 Immersion heater Incalloy 825 immersion heater with dual control safety thermostat XB078 2 Brawa mix thermostatic hot water blending valve XC007 3 Mini expansion vessel XB024 4 Scale inhibitor PCB XB142 5 ITC control thermostat XC010 4 3 2 1 5 ...

Страница 22: ... thermostat this should be set at maximum Checkthattheboilerflowtemperatureisadequatewhenitstopsfiring Boilersshould provide a flow temperature of 82 3 C but temperatures as low as 75 C will allow the BoilerMate BP to provide a satisfactory performance Check that the store is charging to at least 75 C Check that the thermostatic blending valve is set to decline water between 55 C 57 C If all the a...

Страница 23: ...ood House 40 New Road Stourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated 10 12 l m Over 20 l m 5 6 or 8 l m 2 tap half open Fitted with regulator Unregulated 4 Fixing Options For Taps Mixers 1 MK Range Combined Regulators Aerator forscrewingontoTaps ...

Страница 24: ...Page 24 APPENDIX APPENDIX B ...

Страница 25: ... these allow one or two persons to have a purposely designed hold at the top of the appliance to ensure easy lifting at the top of the product e Taking the lead for team lifts As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the items listed within this asse...

Страница 26: ...etailed in the installation and service instructions 9 2 6 Defects caused by corrosion or scale deposits are not covered by any Guarantee 9 2 7 Where we agree to rectify any defect we reserve the right to undertake the work on our own premises 9 2 8 We will not accept any labour charges associated with replacing the unit or parts for any of the following products listed 9 3 Guarantees are provided...

Страница 27: ...oods in the Purchaser s possession and in a manner which enables them to be identified as our goods ii the Purchaser shall immediately return the goods to us should our authorised representative so request All the necessary incidents associated with a fiduciary relationship shall apply d the Purchaser s right to possess the goods shall cease forthwith upon the happening of any of the following eve...

Страница 28: ...ing Products reserve the right to modify products without prior notice It is advisable to check the product technical detail by using the latest design and installation manuals available from our technical support team or on our website Issue 01 11 08 Our appliances are distributed through Gledhill Building Products depots at Blackburn Braintree Bristol Dudley Hemel Hempstead Huntingdon Inverkeith...

Отзывы: