DESIGN

TECHNIC

AL DA

TA

Standard Equipment

The standard configuration of the BoilerMate 
A-Class SP SOL is shown opposite. The Appliance 
Controllers  mounted  inside  the  appliance, 
control the operation of the complete system. 
These are pre-wired to a terminal strip where all 
electrical connections terminate. It is supplied 
with the following factory fitted equipment:-

Switch immersion heater (2 x 3kW elements & OHT’s)

Grundfos UPR 15-50 (185 & 215 model) or 
15-60  boiler/central heating pump

Overheat (top) sensor pocket (Sensor S1/S2)

Middle sensor pocket (Sensor S6)

Bottom sensor pocket (Sensor S5)

DHW (CW) inlet sensor, S3

DHW outlet sensor, S4

Grundfos UPR 15-50 PHE pump

Filter & flow regulator

10  Plate heat exchanger
11  Isolating valves
12  Non return valve
13  Open vent/safety connection
14  Cold feed/expansion connection
15  CW inlet connection
16  HW outlet connection
17  Thermal store drain tapping
18  Return from PHE to store
19  Flow from store to PHE
20  Combined boiler/heating return
21  Primary flow manual air vent
22  Boiler flow (from boiler)
23  CH flow
24  2 port valve V1 (boiler flow)
25  2 port valve V2 (CH flow)
26  Solar heat exchanger return connection 

to solar panel

27  Solar heat exchanger flow (collector) 

connection from panel

28  Remote solar panel sensor (T1) & cable
29  Solar return sensor (T2)
30  Solar overheat sensor (T3)
31  Solar circuit pump UPS 15-60 (high temp.)
32  Solar controller
33  User control panel/clock
34  Appliance control board
35  Electrical DIN rail
36  Solar expansion vessel connection (fitted 

with pressure gauge)

37  100mm high installation base

Optional Equipment

• 

Hot and cold water manifolds for use with 
plastic pipework (Set 1 or 2).

• 

Electronic scale inhibitor for mains water 
services  with  hardness  levels  above 
200ppm (mg/l) fitted in the appliance.

• 

Polyphosphate scale and corrosion inhibitor 
for  mains  water  services  with  hardness 
levels above 300ppm (mg/l) for fitting on 
site by the installer.

Figure 1.9

4

5

24

8

11

7

11

19

31

3

37

6
18
11/12
9
15

16

10

33

34

35

32
30

25

20

17

29

28

23

11

1

11

2

22

27

14

26

21

36

13

Note 1: 

All the panels, pipework and other components necessary for the installation 

of the remainder of the solar system can be supplied by Gledhill with the BMA SP SOL 
appliance. For further details please contact the Gledhill Technical Sales Dept.

Note 2: 

A single feed and expansion cistern will be supplied with the BMA 200 and 220 

SP SOL appliances. Two feed and expansion cisterns will be supplied for other models.

Note 3:

  A  solar  commissioning/filling  assembly  is  provided  separately  for  fitting 

vertically on site (see diagram on page 9 for more detail).

Содержание BMA 200 SP-SOL

Страница 1: ...ons before installation Model Numbers BMA 200 SP SOL BMA 220 SP SOL BMA 240 SP SOL BMA 260 SP SOL BMA 280 SP SOL BMA 300 SP SOL All models comply with the water heater manufacturers specification for integrated thermal stores A sealed system central heating and mains pressure hot water supply appliance with thermal store designed specifically for use with solar energy ISSUE 5 06 08 ...

Страница 2: ...eme as an option to notifying the Local Authority directly Similar arrangements will follow for Scotland and will apply in Northern Ireland from 1st January 06 CORGI operates a Self Certification Scheme for gas heating appliances These arrangements represent a change from the situation whereby compliance with theBuildingRegulationswasacceptediftheBenchmarkLogbookwascompletedand this was then left ...

Страница 3: ...S6 are connected to the appliance control PCB which operates all theheatingandhotwaterfunctionsasthebasic BoilerMate appliance Sensors T1 T2 and T3 are connected to the Danfoss controller and operate all the solar functions SensorT3providesahightemperatureinterlock to de activate the solar pump at a temperature of 90 C in the store Although sensors T3 and T2 are wired in to the solarcontrollerthec...

Страница 4: ...beorderedasanoptionalextrabut will need fitting on site by the installer Note If the summer towel rail circuit is required this willneedtobeaseparatezonedcircuitfromthe heating circuit complete with its own time and temperature controls The standard manual fill model BoilerMate A ClassSPSOLapplianceisshown Aballvalveand overflowareavailableasanoptionalextraatthe time of order If required these sho...

Страница 5: ...pth F BMA 200 SP SOL 1980 660 630 BMA 220 SP SOL 1980 660 630 BMA 240 SP SOL 2175 660 630 BMA 260 SP SOL 2175 710 680 BMA 280 SP SOL 2175 740 710 BMA 300 SP SOL 2085 810 780 The above dimensions include the 100mm high installation base and allow space for installation maintenance of the appliance only The height shown for the 200 220 models also allowsfortheinstallationoftheF Ecistern with no ball...

Страница 6: ...s easier if all pipes protrude vertically in the cut out area shown Compression or push fit connections can be used All pipe positions are approximate and subject to a tolerance of 20mm in any direction A 15mm cold water supply and a 22mm warning overflow pipe may also be required for the separate feed and expansion cisterns if these are located in the appliance cupboard Note All dimensions are sh...

Страница 7: ...rom any direction It is easier if all pipes protrude vertically in the cut out area shown Compression or push fit connections can be used All pipe positions are approximate and subject to a tolerance of 20mm in any direction A 15mm cold water supply and a 22mm warning overflow pipe may also be required for the separate feed and expansion cisterns if these are located in the appliance cupboard Note...

Страница 8: ...ude vertically in the cut out area shown Compression or push fit connections can be used All pipe positions are approximate and subject to a tolerance of 20mm in any direction A 15mm cold water supply and a 22mm warning overflow pipe may also be required for the separate feed and expansion cisterns if these are located in the appliance cupboard Note All dimensions are shown in mm and are to the ce...

Страница 9: ... flow collector connection from panel 28 Remote solar panel sensor T1 cable 29 Solar return sensor T2 30 Solar overheat sensor T3 31 Solar circuit pump UPS 15 60 high temp 32 Solar controller 33 User control panel clock 34 Appliance control board 35 Electrical DIN rail 36 Solar expansion vessel connection fitted with pressure gauge 37 100mm high installation base Optional Equipment Hot and cold wa...

Страница 10: ...licone 2 Bl Bl R 2 x 3kW Heating Elements R SL H E E PE IH 2 5 mm SID Silicone 2 2 5 mm SID Silicon 2 2 5 mm SID Silicone 2 4 0 mm SIF Silicone 2 2 5 mm SIF Silicone 2 2 5 mm SIF Silicone 2 2 5 mm SIF Silicone 2 2 5 mm SIF Silicone 2 2 5 mm SID Silicone 2 Dedicat Remove link to fit room stat 3 WAY BUS BAR C1 A1 A2 2 4 1 3 2 5 mm SID Silicone 2 2 5 mm SID Silicone 2 3 1 2 4 ISSUE No 4 APPROVED DATE...

Страница 11: ...Speed Y Br G Wh S5 S6 Duplex Sensor must fitted into S6 pocket i e above both V3 V2 valves Duplex Sensor must be fitted in top saftey overheat pocket and secured G Y Or Wh B B J34 J5 J30 J31 J9 1 Br Br B B R Or R Or Dedicated Solar Zone Sensor Solar Collector Sensor fitted in the panel sensor pocket provided by manufacturer Minimum pocket size 8mm 8 7 6 5 A B C D E DRG NAME DRG SIZE JOB NAME TITLE...

Страница 12: ...n Expansion Vessel PRV 0 20 100 120 40 80 60 0 2 10 4 8 6 Temperature Gauge and Check Valve This component arrangement is provided with the SOL appliance and must be mounted vertically on the connection provided No isolation valve should be installed between the solar circuit and the safety valve pressure reducing valve Note No valves should be fitted on the pipework between the solar collector an...

Страница 13: ... will not be affected by holding off the boiler and operates independently of channel 1 If a high hot water demand is expected or the appliance runs out of hot water due to poor solar gains the setting of Channel 1 can be overridden which will bring on the boiler and ensure hot water is made available Dependant on use weather the off times suggested above can be adjusted as necessary to ensure ade...

Страница 14: ...artonatemperaturedifferentialof5 Candthe pump will run until the temperature differential is below 2 C The controller will also exercise the pump for 1 minute every 14 days to help stop it sticking if it has not been used Solar Heat Output Gives the performance of the solar heat installation Thefigureiscalculatedonthebasis of the difference between the temperature in the solar collector and the te...

Страница 15: ...p model connections Set speed higher No alarm temperature flashes Pump runs indicates high temperature Pump does not run Set speed higher Pump or pump output defective For any further technical information assistance regarding this product please ring the Gledhill Technical helpline on 08449 310000 Solar collector Thermal Store 0 95 120 40 Operating range Sensor fault alarm Sensor fault alarm Sens...

Страница 16: ... to 4 bar WATCHING THE LEVEL OF FLUID IN YOUR BOTTLE and adding more antifreeze solution if required When a pressure of 4 bar is achieved close the filling point on the fill and flush valve at the SAME time switch off the power at the RCD safety device Now leave the system under this pressure for at least 30 minutes Check the system for leaks including the roof connections If after 30 minutes the ...

Страница 17: ...l valve Vemco FT206 All 11 1 x 6 kW switch immersion heater Wardtec XB468 All 12 Bottom store sensor Tasseron GT198 All 13 Middle store sensor Tasseron GT198 All 14 Top OHT store sensor Tasseron GT199 All 15 Main PCB controller Argus Vision XB442 All 16 Front panel user membrane All 17 Internal fuses circuit protection MCB Single Pole 6A x 1 XB449 All MCB Single Pole 16A x 2 XB450 All 18 Switch co...

Страница 18: ...Page 18 1 2 3 4 24 5 6 12 13 7 8 9 10 11 15 16 20 19 17 21 23 30 31 29 27 28 26 14 18 22 SHORT PARTS LIST INSTALLATION 34 ...

Страница 19: ...Page 19 ...

Страница 20: ...Page 20 ...

Страница 21: ...Page 21 ...

Страница 22: ...in materials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge during the first year after delivery by us ii thereafter at a charge of one tenth of the then current list price and any copper price supplement and delivery charge during the second year after del...

Страница 23: ...ject to of any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c until property in the goods supplied hereunder passes to the Purchaser in accordance with paragraph 2 above i the Purchaser shall hold the goods in a fiduciary capacity for us and shall store ...

Страница 24: ...Thecodeofpracticefortheinstallation commissioning servicingofcentralheatingsystems ...

Отзывы: