21
.
Turn off main air supply and disconnect air line from
the system.
.
Generously coat the exposed transfer pump shafts
with lithium grease.
10.
Coil the heated hoses with a minimum four foot
diameter to avoid kinking and subsequent damage to
the internal electrical wiring.
11.
For gun shut down, follow the procedure from the
gun manual.
12.
The length of time a system is shut down, and the
climate conditions it’s stored in will determine how
often the system should be purged and refilled.
Usually every 2 - 4 weeks the following procedure
should be followed.
Purge and Refill Procedure
1.
Connect the main air line to the system.
2.
Adjust main air regulator to 20 psi.
3.
Adjust transfer pump regulators to approximately 40 psi.
4.
Remove the side blocks from the gun.
Section 2 - Operation: Shut-Down Instructions
PROBLER P2
Содержание GUARDIAN A6-6000
Страница 25: ...23 REVISION E Section 3 General Information Assembly Drawings 23675 XX Unit Assembly...
Страница 26: ...24 REVISION E Section 3 General Information Assembly Drawings 23675 XX Unit Assembly...
Страница 28: ...26 REVISION E Section 3 General Information Assembly Drawings 23675 XX Generic System Schematic...
Страница 29: ...23675 XX System Schematic 220V Single Phase 27 Section 3 General Information Assembly Drawings REVISION E...
Страница 30: ...23675 XX System Schematic 220V Three Phase 28 Section 3 General Information Assembly Drawings REVISION E...
Страница 31: ...23675 XX System Schematic 380V Three Phase 29 REVISION E Section 3 General Information Assembly Drawings...
Страница 32: ...Section 3 General Information Sub Assembly Drawings 30 REVISION D 23450 XX Hybrid Assembly...
Страница 43: ...Section 4 Safety Information Notes 41...