INSTALLING THE STRUCTURAL NETWORK CABLING
The structural network shall be installed in accordance with good electrical practice. Use F-UTP
category 5e cables.
Install the RJ-45 on the cable end and prepare for connection of network devices.
The maximum distance between the network devices is 100 m.
Note!
After completion of structural cabling make the measurements to verify conformity with ISO 1181 or
EN 50173.
INSTALLING AND CONNECTING THE DEVICES
CONNECTING THE VERTEX CONTROL UNIT
Connect the control unit according to the diagram below in the following order:
•
DALI bus
•
LAN
•
230 VAC power supply