4
1
2
Positioning the grab bar
□
Removing the escutcheon
Installation
3
4
□
Loosen the escutcheons (1) from the grab bar (A)
base by gently tapping from the back.
Marking the installation location
Locate the center of the stud by using a stud
finder (not included) or other stud locating
method.(Note:Studs are ususlly 16 in.apart).
Drilling the mounting holes
NOTE:
All screws must be mounted firmly into a wood stud.
Locate the center of the stud by using a stud finder or other
stud locating method.(Studs are usually 16 inches apart.)
1
A
Place the grab bar (A) on the wall where
desired so that the mounting holes are
positioned over a wood stud. Use a level,
if needed.
A
□
With a pencil,
mark the wall through three holes
on each mounting plate where screws will be used.
Remove the grab bar (A) from the wall
and carefully drill pilot holes as mar
ked.
NOTE
: Ensure the holes are drilled into the
stud.
□
16"
16"