2.2.1 Electrical connections
Electrical installations may only be performed by authorised specialists.
The mains connection cable, the mains connection fuse and the main switch for connecting the electric chain hoist to the mains power
supply must be provided by the customer. A 4-wire cable with a PE protective conductor is needed as a supply line for three-phase
versions. A 3-wire cable with a protective conductor is adequate for single-phase version. The length and cross-section must be
appropriate for the power consumption of the electric chain hoist.
2.2 Connections
The safety directions for handling with loads should be followed (see chapter 0.3) when transporting and assembling the electric chain
hoist. Electric chain hoists must be assembled by qualified staff, always bearing in mind the accident prevention directions in chapter 0.2.
Before assembly, the electric chain hoist must be stored in an closed room or covered area. Should the electric chain hoist be destined for
operation outdoors, then it is recommended that a protective cover is erected to shield it from the effects of the weather.
Wherever possible, the electric chain hoist should be transported in its original packaging. The goods delivered should be checked for
completeness and the packaging disposed in an environmentally sound manner. It is recommended that the electric chain hoist is assem-
bled and connected on-site by qualified personnel.
2.1 Transport and assembly
Mechanical adjustments may only be performed by authorised specialists.
Operating staff must carefully read the instruction manual of the electric chain hoist before initial start-up and carry out all the
checks. The device shall be put back into operation only after operational safety has been established. Unauthorised persons
may not operate the device or carry out work with it.
The operator must create an inspection pass during the commissioning of the electric chain hoist. The inspection pass con-
tains all the technical data and the date of commissioning. It provides a record of all servicing and maintenance work.
2 Start-up
By pressing the emergency stop button, the power supply to the electric chain hoist is interrupted in all phases. The movement of the
electric chain hoist is stopped immediately. To unlock the emergency stop button, it must be turned in the indicated direction.
After an emergency stop, the operator may only restart the electric chain hoist after a competent person is satisfied that the
cause which led to the emergency stop has been eliminated and that there is no longer any danger from further operation of
the system.