8: Motion detector connection diagram
o
Connect controller and optional installation button T, NC contact, according to connection
diagram ( 8).
o
If multiple motion detectors are to switch a shared load, connect the motion detectors in
parallel.
i
Parallel switching of multiple motion detectors does not increase maximum connected load.
9: Connection diagram, switching off motion detectors
The motion detector can be switched off using installation switch S1 or S2 ( 9). Switching
installation switch S1 on again triggers switch-on for the follow-up time. Installation S2 does not
do this.
82523522
19.05.2011
6/8
Observer 70