39
Gigaset N870 IP PRO / LUG IE-UK_IM en / A31008-XXXXX-XXXX-X-XX / mess_kit.fm / 8/24/18
V
e
rsio
n 2,
06
.0
8.
201
0 / M
o
d
u
leV
e
rs
io
n 1.
0
Working with the Gigaset N720 SPK PRO
Setting up the measuring base station
To ensure freedom of movement when measuring and not be dependent on being able to reach
a power connection, operate the measuring base station with external batteries. The case
contains a battery pack with eight integrated batteries and one charging device for this purpose.
Preparing the base carrier
¤
Remove the base carrier from the case
together with the measuring base station
and battery pack.
¤
Slide the lid to the left to open the battery
compartment
§§1§§
.
Lift the lid gently with your fingernail
to get past the lock on the right edge.
¤
Plug the connector on the battery pack
cable onto the two pins on the left side
of the battery compartment
§§2§§
.
Note:
The connector is shaped so that it can
only be attached the correct way round. If the
connector is forced into the wrong position,
the pins may be damaged, rendering the
device unusable.
¤
Insert the battery pack into the battery
compartment in the base carrier
§§3§§
.
¤
Slide the lid onto the battery compartment
§§4§§
until it clicks into place.
1
2
3
4