- 21 -
Hardware Installation
2-5 Hard Disk Drive LEDs
NOTE!
(*1) Depend on HBA/Utility Spec
(*2) Blink cycle depend on HDD’s activity signal.
(*3) If HDD is pulled out during rebuilding, Disk status of this HDD is regarded as fault
LED#1 LED#2
RAID SKU
LED #1
Locate
HDD
Fault
Rebuilding HDD Access HDD Present
(No Access)
No RAID
configuration
(via HBA)
Disk LED (LED
on Back Panel)
Green
ON(*1)
OFF
BLINK (*2)
OFF
Amber
OFF
OFF
OFF
OFF
Removed HDD
Slot (LED on
Back Panel)
Green
ON(*1)
OFF
--
--
Amber
OFF
OFF
--
--
RAID
configuration
(via HW RAID
Card or SW
RAID Card)
Disk LED
Green
ON
OFF
BLINK (*2)
OFF
Amber
OFF
ON
(Low Speed:
2 Hz)
OFF
OFF
Removed
HDD Slot
Green
ON(*1)
OFF
(*3)
--
--
Amber
OFF
ON
(*3)
--
--
LED #2
HDD Present
No HDD
Green
ON
OFF
Содержание R282-N80
Страница 27: ... 27 Hardware Installation 5 1 3 2 4 6 4 3 ...
Страница 36: ...Hardware Installation 36 3 9 Cable Routing RAID CARD SAS0 SAS1 RAID CARD ...
Страница 37: ... 37 Hardware Installation SAS2 SAS3 ...
Страница 38: ...Hardware Installation 38 SAS4 SAS5 ...
Страница 39: ... 39 Hardware Installation SAS6 USB Cable ...
Страница 40: ...Hardware Installation 40 B P Cable F P Cable ...
Страница 41: ... 41 Hardware Installation HDD BP Signal HDD Power ...
Страница 69: ... 69 BIOS Setup 5 2 12 Intel R i350 Gigabit Network Connection ...
Страница 74: ...BIOS Setup 74 5 3 1 Processor Configuration ...
Страница 110: ...BIOS Setup 110 This page intentionally left blank ...