- 19 -
Hardware Installation
No. Name
Color
Status
Description
7.
LAN1 Active/
Link LED
Green
On
Link between system and network
or no access
Green
Blink Data transmission or receiving is occurring
N/A
Off
No data transmission or receiving is occurring
8.
LAN2 Active/
Link LED
Green
On
Link between system and network
or no access
Green
Blink Data transmission or receiving is occurring
N/A
Off
No data transmission or receiving is occurring
Содержание R282-N80
Страница 27: ... 27 Hardware Installation 5 1 3 2 4 6 4 3 ...
Страница 36: ...Hardware Installation 36 3 9 Cable Routing RAID CARD SAS0 SAS1 RAID CARD ...
Страница 37: ... 37 Hardware Installation SAS2 SAS3 ...
Страница 38: ...Hardware Installation 38 SAS4 SAS5 ...
Страница 39: ... 39 Hardware Installation SAS6 USB Cable ...
Страница 40: ...Hardware Installation 40 B P Cable F P Cable ...
Страница 41: ... 41 Hardware Installation HDD BP Signal HDD Power ...
Страница 69: ... 69 BIOS Setup 5 2 12 Intel R i350 Gigabit Network Connection ...
Страница 74: ...BIOS Setup 74 5 3 1 Processor Configuration ...
Страница 110: ...BIOS Setup 110 This page intentionally left blank ...