![Gigabyte E152-ZE0 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/gigabyte/e152-ze0/e152-ze0_user-manual_2225168034.webp)
System Hardware Installation
- 34 -
3-8 Installing the Mezzanine Card
Use of the following type of OCP 3.0 NIC is recommended:
• OCP 3.0 SFF with pull tab
• OCP 3.0 SFF with ejector latch
Follow these instructions to install an OCP 3.0 Mezzanine card:
1. Remove the screw securing the OCP 3.0 card slot cover.
2. Remove the slot cover from the system.
3.
Insert the OCP 3.0 card into the card slot ensuring that the card is firmly connected to the connector
on the motherboard.
4. Tighten the thumbnail screw to secure the OCP 3.0 card in place.
5. Reverse steps 3-4 to replace the OCP 3.0 card.
1
2
3
Содержание E152-ZE0
Страница 1: ...R152 ZE0 AMD EPYC 7003 UP Server System 1U Gen4 NVMe User Manual Rev 1 0 ...
Страница 10: ... 10 This page intentionally left blank ...
Страница 16: ...Hardware Installation 16 This page intentionally left blank ...
Страница 22: ...System Appearance 22 This page intentionally left blank ...
Страница 37: ... 37 System Hardware Installation PMBus Cable Power Distribution Board to Motherboard Power Cable ...
Страница 40: ...System Hardware Installation 40 This page intentionally left blank ...
Страница 44: ...Motherboard Components 44 This page intentionally left blank ...
Страница 50: ...BIOS Setup 50 When Boot Mode Select is set to Legacy in the Boot Boot Mode Select section ...
Страница 63: ... 45 BIOS Setup 5 2 8 PCI Subsystem Settings ...
Страница 74: ...BIOS Setup 74 5 2 17 Intel R Ethernet Controller I350 ...
Страница 138: ...BIOS Setup 138 This page intentionally left blank ...