Campetto 7 Underfloor distributor system
Seite 7 / 10
Created
01.12.2013
ROEN
Modified
01.12.2013
ROEN
Object-ID
359749
Check drainage capacity!
The excavation work as well as the professional and standards-compliant installation must be performed by
the customer. It is important to ensure that the load capacity of the foundation and/or the cover layer corre-
sponds to the load capacity of the underfloor distributor system in order to prevent subsidence. Delivery of
concrete pipe has to be done on site by the customer.
Caution
If the Underfloor distributor system is to be used immediately after the excavation work, the installation pit must
absolutely be secured or locked so that it does not pose a safety risk!
3.2 Connecting underfloor distributor to power supply
Caution
The electrical connection may only be made by trained personnel and is the responsibility of the operator.
3.2.1
Principle drawing
The details necessary for proper installation can be found on the project-specific drawing from GIFAS. Custom
models may vary from the following drawings.