12.3 Driling
The central drilling determines the position on the bench of
MarkLED.
The bore through the cable duct base plate or the New Jer-
sey profile for the cable passage determines the alignment
of the MarkLED.
Drill the holes exactly, because the orientation can only be
adjusted minimally.
12.3.1 Dimensions for drilling holes
12.4 Installation and connection of MarkLED
Blow out drilling dust and clean the surface as dust-free as
possible for gluing the MarkLED.
Lead the connection cable of the MarkLED through the ca-
ble drilling.
Connect cable to junction box or cable sleeve.
Insert nylon dowels into the mounting bore.
Apply Permafix on the bottom of MarkLED.
Central drilling: Ø
6mm
for dowel
depth: 40 mm
Hole for supply cable: Ø
min. 12mm
max. 20mm
Light emission