![Gifas-electric MarkLED 4 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/gifas-electric/markled-4/markled-4_installation-instructions-manual_2222449012.webp)
MarkLED 4
Page 12 / 38
Created
03.10.2017
chal
Modified
28.11.2017
chal
Object-ID
850593
7 Measuring of MarkLED placement with current collector
-
Marking of locations of MarkLED units in accordance with project default (by spray colour)
-
Recommendation:
-
Tunnel entrance (adaption): a MarkLED each 12.5 m (according to ASTRA/BAST regula-
tions)
-
Middle of tunnel: a MarkLED each 25 m
-
Tunnel exit (adaption): a MarkLED each 12.5 m (according to ASTRA/BAST regulations)
Colour markings
Hint
Due to obstacles (pit/joints etc.)
the location of MarkLED has to be
replaced as less as possible.