TrafficLED / CircLED
Seite 15 / 22
Created
15.06.2015
chal
Modified
04.10.2017
roen
Object-ID
989827
Mark the levelling console and position it at the intended
installation location.
Hint
We recommend that the TrafficLED base always be in-
stalled before laying any steel reinforcement.
Mark the attachment points and drill appropriate
mounting holes for the dowels.
Fasten the levelling console
Screw the console onto the surface using 4 screws
(max. screw diameter = 6.0mm).
(In the picture, additional spacers had to be attached
in order to reach the level of the road.)
Level the installation box
Adjust the 3 levelling nuts uniformly until the upper
edge of the alignment ring is precisely at the level
of the finished ground/road surface.
(the mounting bracket shown on the image is not con-
tained in the scope of delivery).