Giersch GG20-LN Скачать руководство пользователя страница 18

18

E

.0

4.

99

 •

 G

. 0

9.

05

.1

2

Set min. output 1st stage:

Set burner to low load 1st stage and correct
exhaust gas values at "N".

for GG20-M-L-LN:

To do so, set the output controller to min. output 
(contact from "T6" to "T7" in socket unit X32).

for GG20-Z-L-LN:

Set 1st/2nd stage switch to 1st stage.

Adjust nozzle pressure by adjusting cam
ST1/min. according to the table.

Correct the exhaust gas values at "N".

For the positioning drive to approach the newly set 
cam position, the output controller must be set to 
max. output requirement for a few seconds (contact 
from "T6" to "T8").
The positioning drive moves up.

Reset the output controller to min. output request again (contact from "T6" to "T7").
The positioning drive moves to the newly set min. position.
On the 2-stage sliding version, set the switch 1st/2nd stage briefly to 2nd stage and then reset to 1st 
stage.

Correct the exhaust gas values at "N".

If necessary, repeat adjustment procedure of cam position ST1/min. output as described above until 
desired nozzle pressure is achieved.

As the adjustments "V“ and "N“ mutually influence each other, the burner must be run up and down 
several times between max. and min. heat requirement of the 1st/2nd stage output controller.

For max. output, correct 2nd stage exhaust gas emission by adjusting "V“ and for min. output correct 
1st stage by adjusting "N“.

Start the burner; if the burner does not start, alter "N“ in direction "+“ and start burner again. Check 
exhaust gas emission and, if necessary, alter 1st stage min./start output.

Close the measuring connection pieces "A“ and "B“ - Do 

not

 close the possibly non-used 

connection 

pF

.

Caution !
Difference between baffle plate pressure p

L

 - furnace pressure p

F

 must be at least 0.3 mbar.

Adapt nozzle

pressure

min. output

Min. output

Increase ST1/min. 

output if:

Output/nozzle pressure

too low

Increase ST1/min. 

output if:

Output/nozzle pressure

too high

Setting "N"

Exhaust gas analysis 

values

Change in "+"

direction if:

CO

2

too low

O

2

 

too high

Change in "-"

direction if:

CO

2

too high

O

2

too low

Start-up

Содержание GG20-LN

Страница 1: ...Technical Information Installation Instructions Gas May 2012 edition In the interests of continuous product improvement technical specifications are subject to change without prior notice GG20 LN GB...

Страница 2: ...actuator STA 13 B0 10 15 Adjusting the mixing head 11 16 Adjusting the ignition electrode 11 17 Adjusting the inlet nozzle 11 18 Gas burner with gas train 12 19 Adjustment tables 14 20 Modulating or...

Страница 3: ...Liquefied gas regulation Part 2 Regulations of cantonal authorities e g fire department regula tions The gas pipe must be designed to conform to the flow rate and the available gas flow pressure and...

Страница 4: ...ure with MB VEF 412 1 20 Mode of operation 2 stage modulating Voltage 1 N PE 50 Hz 220 240 V Current consumption start max operation 1 9 1 3 A 3 9 2 6 A Electric motor power at 2800rpm in kW 0 18 0 37...

Страница 5: ...g agent for leaks and vent the gas pipe When venting use a hose to discharge the gas safely to the atmosphere For proportional pressure control GG 20 25 Z M L LN with KEV Fit the furnace pressure mete...

Страница 6: ...of injury by fan impeller on activation in service position Release quick release locks 5 x and detach base plate Place the keyhole openings in the base plate onto the socket head cap screws of the h...

Страница 7: ...or a quick acting fuse rated for max 10 A Connection diagram T8 T7 T6 B5 Buchsenteil X32 X12 am Brenner Steckerteil X31 X11 zum Kessel X31 X32 zu auf Anschluss f r GG20 M L LN Y9 T8 T7 T6 B5 Buchsente...

Страница 8: ...nce the faults are not reset after a power failure the burner motor switches on for approx 2 3 sec when the supply voltage is connected before the device goes into fault mode again and displays the la...

Страница 9: ...ir controller does not close within a defined time span Air controller opens Air controller contact opens during start up or operation Flame failure Flame failure signal in operation Honeywell DMG 972...

Страница 10: ...djusting the burner to the re quired min max output are given in the adjustment ta ble see adjustment tables on pages 14 15 For this Remove the hood from the positioning drive Alter the cam positions...

Страница 11: ...e position of the inlet nozzle is preset at the factory but can be adapted to different system operating condi tions altitude above sea level and outputs To adjust undo the screws as shown Set the new...

Страница 12: ...nlet pressure The burner is shut down if the gas inlet pressure drops below the set minimum value preset at factory to 12 mbar The burner starts up au tomatically again when the minimum pressure is ex...

Страница 13: ...sure max 100 mbar Permissible outlet pressure pG 0 4 to 50 mbar Max pressure drop 50 mbar PE PG Ambient temperature 10 C to 60 C Connecting flanges The connecting flanges are secured with 4 screws The...

Страница 14: ...0 8 0 2 0 15 5 7 8 170 85 156 78 100 20 17 0 12 2 7 18 8 9 4 GG20 1 N LN Natural gas E Hi n 10 4 kWh m3 Burner output kW Boiler output 92 kW Air flap position Mixing head position mm Position inlet no...

Страница 15: ...sure pG mbar Gas flow rate m3 h Stage 2 Stage 1 Stage 2 Stage 1 2nd stage P9 1st stage P1 Stage 2 Stage 1 Stage 2 Stage 1 107 70 98 64 40 0 27 0 6 6 2 8 10 6 6 9 130 70 120 64 58 0 27 0 9 5 2 8 12 9 6...

Страница 16: ...output For this Check the nozzle pressure with U pipe pressure gauge at measuring point pG Adjust gas pressure and air flow dimension A according to adjustment tables Be sure to check the exhaust gas...

Страница 17: ...ew V is used to change the ratio to achieve the desired gas nozzle pressures pG see adjustment table and exhaust analysis val ues CO2 CO Burner start Start the burner at low load if the burner does no...

Страница 18: ...adjustment procedure of cam position ST1 min output as described above until desired nozzle pressure is achieved As the adjustments V and N mutually influence each other the burner must be run up and...

Страница 19: ...o table 989 mbar Gas pressure PG at meter 20 mbar Gas temperature G 16 C Boiler rating Qn 30 kW Efficiency K assumed 92 Calorific value Hi n 10 4 kWh m3 Gas flow in standard state Vn 1 Gas flow in ope...

Страница 20: ...m3 for the example given above is VB 3 3 m3 h Gas flow setting Measured flow duration in seconds s Measures Greater than calculated flow duration tsoll Increase gas flow Less than calculated flow dur...

Страница 21: ...ent must be carried out directly after post ignition during the safety time The ionisation current must be at least 1 5 A Values below 1 5 A will result in unreliable operation or produce a fault In t...

Страница 22: ...4 99 G 09 05 12 25 Circuit diagram GG20 Z L LN till 180 W GG20 Z L LN off 180 W SP_1 658 1 Burner Gas train Boilter controller SP_1 613 3 Burner Gas train Boilter controller Service instructions dimen...

Страница 23: ...23 E 04 99 G 09 05 12 GG20 M L LN till 180 W GG20 M L LN off 180 W SP_1 659 1 Burner Gas train Boilter controller SP_1 548 5 Burner Gas train Boilter controller Service instructions dimensions...

Страница 24: ...r switch S1 Control box DMG 972 S4 Push button external fault clearance S5 Switch 1st 2nd stag SK1 Auxiliary terminal S1 SK2 Auxiliary terminal S2 T3 Ignition transformer X11 Plug unit for boiler cont...

Страница 25: ...ing gas flow set too low Increase starting gas flow No ignition Check ignition electrode and setting ignition transformer and cable see Page 11 Phase and zero mixed up Connect connector unit in correc...

Страница 26: ...26 E 04 99 G 09 05 12 27 Exploded drawings GG20 1 LN GG20 2 LN ZBZ_1 507 ZBZ_1 508 Service instructions dimensions...

Страница 27: ...180 W with 162 mm flange for GG20 1 47 90 27139 12 Motor 370 W with 162 mm flange for GG20 2 47 90 26066 13 Control box DMG 972 Mod 04 47 90 22232 14 Control box base GG20 1 Z pre assembled 47 90 270...

Страница 28: ...s GG20 1 LN GG20 2 LN are in conformity with the following standards EN 60335 EN 50081 EN 50082 EN 676 These products are CE labelled in compliance with the provisions of the following directives 89 3...

Страница 29: ...29 E 04 99 G 09 05 12...

Страница 30: ...ven in advance Subject to change 30 Burner overall dimensions boiler connection dimensions All dimensions in mm dimensions in GG20 2 LN 31 Working ranges Working ranges according to DIN EN 676 2008 11...

Отзывы: