3
unit assembly & set-up (cont.)
HOSE SUPPORT BOOM ASSEMBLY (cont.)
•
Lift assembly and install into boom pivot
brackets on discharge stack, first slipping top
portion of vertical boom member into top
bracket on stack, then dropping bottom portion
into bottom bracket.
1
2
•
Catch S-hook on one end of boom support
chain (5:9) into chain eye at end of horizontal
boom member.
•
Slip other end of chain through eye clip atop
hose support band, then adjust chain length
between hose and boom to about three feet
(3/4 of total length) by slipping S-hook on end
of chain through appropriate mid-link.
Содержание 35hp Series
Страница 15: ...1 2 3 4 5 6 7 8 9 9 10 11 GIANT VAC INC Model 3001 3001CHW Sheet 2 of 5 Intake Group R0603 1 See Engine Group ...
Страница 17: ...1 2 3 3 4 5 7 6 GIANT VAC INC Model 3001 3001CHW Sheet 3 of 5 Discharge Group R0603 1 See Engine Group ...
Страница 21: ...1 2 3 4 3 4 5 6 7 8 7 6 9 GIANT VAC INC Model 3001 3001CHW Sheet 5 of 5 Hose Support Boom Group R0603 1 ...