![GHM DeltaOHM LPUVA02 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/ghm/deltaohm-lpuva02/deltaohm-lpuva02_operating-manual_2220425005.webp)
LPUVA02
- 5 -
V2.0
3
INSTALLATION
Before installing the radiometer, refill the cartridge containing silica-gel crystals. Silica
gel absorbs humidity in the dome chamber and prevents, in particular climatic condi-
tions, condensation on the internal walls of the domes and measurement alteration.
Do not touch the silica gel crystals with your hands while refilling the cartridge. Carry
out the following instructions in an environment as drier as possible:
1.
Loosen the three screws that fix the white shade disk.
2.
Unscrew the silica gel cartridge using a coin.
3.
Remove the cartridge perforated cap.
4.
Open the sachet containing silica gel (supplied with the radiometer).
5.
Fill the cartridge with the silica gel crystals.
6.
Close the cartridge with its own cap, paying attention that the sealing O-ring be
properly positioned.
7.
Screw the cartridge to the radiometer body using a coin.
8.
Check that the cartridge is screwed tightly (if not, silica gel life will be reduced).
9.
Position the shade disk and screw it with the screws.
10.
The radiometer is ready for use.
The figure below shows the operations necessary to fill the cartridge with the silica gel
crystals.
Fig. 3.1: filling the silica-gel cartridge
Silica-gel
cartridge
Perforated cap
Sealed sachet
of silica-gel crystals
Filling
Closing the cartridge