background image

page 7 of 21

Hints and Tips

To operate the ottoman, always use 2 hands at arm's length and only where illustrated on this product. You must
ensure the mattress is on the bed frame before lifting the mechanism. Failure to do so may result in injury.

To ensure your safety please do not stand too close in case the frame bounces up. The weight of the

mattress loaded on the frame will keep the frame in a lower position until it is pulled upwards by the user.

If removing the mattress, make sure the frame is secured so it does not flip open. When lifting the bed frame,
remove pillows and covers.

PLEASE NOTE - It takes a lot of force to make the initial movement of the ottoman - THIS IS A DESIGN
FEATURE OF THE PRODUCT SO THAT IT DOES NOT FALL SHUT - and the nearer to being closed the

ottoman is , the easier it is to move. When the ottoman is almost shut, it will close completely under its own weight.

When lowering the slat unit for the first time, take care to make sure it does not rub unevenly on the inside face of
the Side Rail. If it does, the bed has been assembled slightly out of square. This can be rectified by moving the

Footboard of the bed slightly to the left or right whilst leaving the hardboard of the bed frame stationary.

Tip for difficulty with compression:

If  you are experiencing difficulty with the initial compression try fitting one piston at a time (following the Assembly
Instructions) then press down on the side of the frame with the piston fitted - this acts like a big lever (The weight

of the mattress can be used to supplement the load exerted). Effectively you are doubling the amount of force
applied, because you have halved the resistance offered by the pistons. It can take slightly more effort than you
might feel comfortable applying to the bed frame at first.

ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS

Version 1 1/1/18

Содержание Ashbourne Side ottoman bed

Страница 1: ...amiliarise yourself with the various stages of construction Carefully open the pack supplied and check the contents against the parts and fittings check list Do not destroy any of the packaging until...

Страница 2: ...efore use Check all screws or bolts are tightened and inspect regularly This product should only be used on firm level ground Dismantle for transportation Only use recommended accessories Tools are in...

Страница 3: ...duct If any components are missing please contact your retailer The fittings pack contains small items that should be kept away fromsmall children 12 10 8 13 5 5 15 15 3 3 16 16 16 16 18 6 6 7 17 9 9...

Страница 4: ...2 PCS Description LEFT RAIL Carton NO 3 1 PC Description RIGHT RAIL Carton NO 3 1 PC Carton NO 3 1 PC Description BACK RAIL Carton NO 2 Description WOODEN SLAT Qty 2PCS Carton NO 1 Description STORAG...

Страница 5: ...32 34 34 10 20 30 40 50 60 70 80 90 100 1 1 1 A B Not to scale Fixings to scale Ref Qty Dimensions Anti Skid Nut CAUTION There are many small components used in the construction of this product Pleas...

Страница 6: ...nges All pistons are tested in the factory for correct pressure and operation before use Initially it might appear that the pistons are very stiff when opening and closing the ottoman frame THIS IS NO...

Страница 7: ...toman is almost shut it will close completely under its own weight When lowering the slat unit for the first time take care to make sure it does not rub unevenly on the inside face of the Side Rail If...

Страница 8: ...page 8 of 21 Do not attempt to move the bed whilst the frame is in the upright positon ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 9: ...page 9 of 21 Layout Parts on Soft Surface Lay out all 4 sides on a soft surface i e Rug Carpet or Packaing Carton ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 10: ...arts Required H G NO X 2 1 HEADBOARD X 1 2 FOOTBOARD X 1 7 STORAGE BASE SUPPORT X 2 H X 1 G X 4 N X 4 O X 4 6 LEG X 4 STEP 2 Parts Required 1 2 G NO 7 1 2 6 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUC...

Страница 11: ...X 8 STEP 4 Parts Required 3 3 2 1 Make sure the bed is square Note THEN tighten all bolts 100 using allen key ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS X 4 1 2 3 3 X 2 18 18 BOTTOM CROSS METAL...

Страница 12: ...ed 15 STORAGE PANEL X 2 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Be careful not to stand on the storage panels as this could cause damage to the panels 15 15 3 2 3 1 16 TRIANGLE PLATE X 4 H X...

Страница 13: ...IMPORTANT Please ensure the frame poles are fitted according to the illustration exactly If assembled without follwing this illustration the frame will not fit to the bed correctly ASHBOURNE SIDE OTT...

Страница 14: ...1 F X 6 N X 6 O X 6 12 5 ON F H X 2 10 11 13 5 13 11 10 12 page 14 of 21 10 LEFT RAIL X 1 11 RIGHT RAIL X 1 12 BACK RAIL X 1 13 FRONT RAIL X 1 I X 1 L X 8 M X 8 C X 8 Ensure the frame is square befor...

Страница 15: ...X 2 17 HINGE S SUPPORT RAILS X 2 H X 1 G X 8 O X 8 N X 8 BOLTS SHOULD BE POSITIONED AT THE CENTRE OF THE LONG HOLES 9 9 Parts Required LEFT SIDE OPENING OR RIGHT SIDE OPENING ASHBOURNE SIDE OTTOMAN BE...

Страница 16: ...page 16 of 21 STEP 10 Parts Required People are required to fit the frame safety ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 17: ...page 17 of 21 STEP 11 Parts Required Left Side Opening OR Right Side Opening I X 1 L X 12 M X 12 D X 6 B X 1 K X 6 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 18: ...STEP 12 Parts Required 4 GAS LIFT X 2 9 HINGE LEFT RIGHT X 2 B X 1 E X 4 B E B E 9 4 9 9 9 4 B E B E B E page 18 of 21 LEFT RIGHT ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 19: ...STEP 13 Parts Required 14 WOODEN SLAT 3FT X 14 A 3FT X 28 page 19 of 21 ASHBOURNE SIDE OTTOMAN BED ASSEMBLY INSTRUCTIONS Version 1 1 1 18...

Страница 20: ...d on the weight of the mattress so always keep fingers well clear of the metal frame PLEASE NOTE It takes a lot of force to make the initial movement of the ottoman THIS IS A DESIGN FEATURE OF THE PRO...

Страница 21: ...y assembled Periodically check to ensure that the components are in their proper position free from damage Also make sure the connectors are tight and secure keep instructions for future reference ASH...

Отзывы: