GFS NETLIGHT Quattro Скачать руководство пользователя страница 42

system documentation quattro GB V13.docx / Page 42 

 

Setups – Light log on/off 

 

 
 

 

 

 
 

 

 

 
 

 

 

 Save "no" to the next window 

Select the next circuit or press back 

 

or the menu key. 

 

Setups – Lights text (USB-Keyboard necessary) 

 

 
 

 

 

 
 

 

 

 
 

 

 

 

Save "no" to the next window 

Select the next circuit or press back 

 

or the menu key. 

 

Setups – Lights-Scan 

 

 
 

 

 

 
 

 

To cancel the scan prematurely, 

If there are no lights or not detected, they will 

 

press the OK button. 

automatically be directed to the lights log on/off 

 

menu. 

 

 

After a successful SCAN, the lights for lights texts are now available. 

 

 

3x 

SETUPS 

 Lights 

  

  

USER MANUAL 

 Set Timer 

 

 Calibr. circuit 

 Setups 

LIGHTS 

 Light log on/off 

 Lights text 

 Lights-scan 

CIRCUIT SELECTION 

 Circuit: X 

  

 Ci0X 

 

OK 

 

OK 

 

◄ 

◄ 

◄ 

▬ 

 

 

 

OK 

 

OK 

 

 

 

OK 

NEW PROGRAMMING 

 Save      yes 

           no 
  

LIGHT LOG ON/OFF 

   1 M......... 10   

  11 .......... 20 
 Ci0X 

 

 Save . . .  

    
  

CIRCUIT SELECTION 

 Circuit: X 

           
 Ci0X 

 

OK 

 

◄ 

◄ 

◄ 

▬ 

 

 

 

OK 

 

3x 

SETUPS 

 Lights 

  

  

USER MANUAL 

 Set Timer 

 

 Calibr. circuit 
 Setups 

LIGHTS 

 Light log on/off 

 Lights text 

 Lights-scan 

LIGHTS TEXT 

 Circuit: X 

 Lights-No: X 

 Ci0X 

 

OK 

 

OK 

 

◄ 

◄ 

▬ 

 

 

OK 

 

 

 

◄ 

 

OK 

1x 

NEW PROGRAMMING 

 Save      yes 

           no 

  

DESCRIPTION 

 0X-XX  

 Your Lights text 

  

 

 Save . . .  

    

  

CIRCUIT SELECTION 

 Circuit: X 

 Lights-No: X          

 Ci0X 

 

OK 

◄ 

◄ 

◄ 

▬ 

 

 

OK 

 

 

 

OK 

3x 

SETUPS 

 Lights 

  
  

USER MANUAL 

 Set Timer 

 

 Calibr. circuit 
 Setups 

LIGHTS 

 Light log on/off 

 Lights text 
 Lights-scan 

CIRCUIT SELECTION 

 Circuit: X 

  
 Ci0X 

 

OK 

 

OK 

 

◄ 

▬ 

 

 

OK 

 

 

◄ 

 

◄ 

2x 

 

OK 

LIGHTS LOG ON/OFF 

   1 .......... 10   

  11 .......... 20 
 Ci0X 

 

 Lights scan activ   

         . . .  

 Stop 

◄ 

 

OK 

 

 

Содержание NETLIGHT Quattro

Страница 1: ...ption operating notes data Page 19 24 Principle circuit diagrams Page 25 33 Commissioning Page 34 35 Operating instructions Page 36 53 Manufacturer notes Page 54 Appendix 1 Possible fault indications...

Страница 2: ...system documentation quattro GB V13 docx Page 2...

Страница 3: ...system documentation quattro GB V13 docx Page 3...

Страница 4: ...system documentation quattro GB V13 docx Page 4...

Страница 5: ...LATION 11 3 1 INSTRUCTIONS 11 3 2 INSTALLATION PREPARATION 11 3 3 OPENING CLOSING THE DEVICE 12 3 4 WALL MOUNTING 13 3 5 EXPANSION HOUSING 14 3 6 CABLE ENTRY FUSES 15 3 7 CONNECTION COMPARTMENT 16 3 8...

Страница 6: ...BEFORE COMMISSIONING 34 6 2 COMMISSIONING 34 6 2 1 NOTES ON VOLTAGE MEASUREMENTS 34 6 2 2 CONNECTION OF THE MAINS SUPPLY LINE 34 6 2 3 CONNECTING THE MAINS SUPPLY AND MONITORING THE SYSTEM STARTUP 34...

Страница 7: ...y must be observed Only luminaires with electronic ballasts that correspond to the respective operating voltages specified in the data sheet may be used on the final circuits of the system The nominal...

Страница 8: ...system or parts of it 1 4 Intended use The central power supply system is only suitable for use in safety lighting systems It is used to monitor and control the safety lighting system with general lig...

Страница 9: ...ot necessary to defer a test after power failure Test operations are blocked in case of battery undervoltage and emergency operation The automatic test of the total measurement duration of the system...

Страница 10: ...of 5 to 40 C at most Condensation must be excluded If batteries are supplied with the system they must also be stored in a clean dry place The ambient temperature should be between 0 and 25 C It must...

Страница 11: ...a technically faultless condition and only for the intended purpose The safety instructions in the manual as well as the operator s instructions must be observed For the safe operation of the install...

Страница 12: ...ide view Dome pins for fixing the housing cover when closing make sure that the pins are seated correctly in their uptakes When closing the hood first place it at an angle with the upper dome pins and...

Страница 13: ...4x 12V 26Ah 52Ah approx 48 kg incl 1x expansion housing 350VA 3h 2x 12V 65Ah approx 61 kg incl 1x expansion housing 88VA 8h 4x 12V 18Ah 36Ah approx 35 kg 188VA 8h 2x 12V 65Ah approx 61 kg incl 1x expa...

Страница 14: ...ttom left and right Close The inverted order of open Open 3 Finally pull the housing away from the front and down Open 1 The quattro housing must be open then remove the screw at the top bottom of the...

Страница 15: ...e pre perforated round entries can be broken out to insert the cables Fuses F1 4 circuits 1 4 6 3x32 T 1 6A F5 mains fuse 6 3x32 T 6 3A For trouble free operation we recommend for the cable entry of t...

Страница 16: ...inal circuits L N PE Colour grey blue light green 230V 50Hz from mains or inverter per circuit fuse protection 6 3x32 T1 6A per circuit max 200VA Total power of circuits 1 to 4 max 350VA X2 signalling...

Страница 17: ...ith DIN VDE 0510 Part 2 and read the battery manufacturer s data sheets Before connecting the battery make sure to compare the set values for trickle charge and boost charge of the charger with the va...

Страница 18: ...SBL battery series 3 10 Installation completion tasks Make sure that the system is free of dust and that no tools are left behind after installation Loose parts and tools lying around are sources of...

Страница 19: ...g Expansion housing H 250mm W 410mm D 205mm 1 Fuses 2 Cable entry 3 USB network connection 4 Fixing holes keyhole 12 7 mm 5 Connection compartment 6 Base board 7 Display and control panel 8 Charging u...

Страница 20: ...lready integrated Cable entry via membrane gland plate Wall mounting Distance hole 7mm to top edge of roof 30mm Hole centre 359mm HxWxD approx 1000x500x250mm 1 Fuses 2 Cable entry 3 USB network connec...

Страница 21: ...tus LEDs 4 line display Back with the Left arrow key or press the menu key again Whenever this symbol appears you can switch back one level by pressing the Left arrow key Whenever this symbol appears...

Страница 22: ...be operated as if it were operated directly on the device All screens of the master display are also displayed on the PC screen in real time On the other screens the status states measured values from...

Страница 23: ...0 C to 40 C Housing material Supporting elements galvanised sheet steel Hood plastic UL94 HB Colour middle section ABS 24 Alu brushed Colour side panels PS 36 brilliant blue RAL 5007 Cable entry from...

Страница 24: ...igation keypad Operating notes Symbol in the operating instructions for Arrow up Arrow left back Arrow right Arrow down Values must be set in the display Select in the display Confirm Menu Menu OK Arr...

Страница 25: ...uit diagrams terminal diagram 5 1 1 Circuit diagram 230V final circuits 1 4 inputs 1 4 LAN USB r 6 3 Fuse types Art 112153 micro fuse 5x20 2 5A slow Art 112382 micro fuse 6 3x32 1 6A slow Art 112333 m...

Страница 26: ...system documentation quattro GB V13 docx Page 26 5 1 2 Circuit diagram Messages inputs E5 9 panel module BUS...

Страница 27: ...system documentation quattro GB V13 docx Page 27 5 2 1 Terminal diagram X2 X4 X5...

Страница 28: ...system documentation quattro GB V13 docx Page 28 5 2 2 Terminal diagram X6 X8 X9...

Страница 29: ...system documentation quattro GB V13 docx Page 29 5 3 Mains connection panel connection...

Страница 30: ...system documentation quattro GB V13 docx Page 30 5 4 Three phase monitoring X0...

Страница 31: ...system documentation quattro GB V13 docx Page 31 5 5 Digital inputs 1 4 230V AC...

Страница 32: ...system documentation quattro GB V13 docx Page 32 5 6 Network monitoring loop digital inputs 5 8 for pot free contacts...

Страница 33: ...d by means of the Netlight ProVisu software on the network panel The cables and cable lengths normally used for networks apply here For the connection cables we recommend to use CAT7 cables for connec...

Страница 34: ...a 6 2 2 Connection of the mains supply line Before connecting the supply lines the value of the mains voltage must be measured and compared with the data on the nameplate After the measurement disconn...

Страница 35: ...h off the system via the operating and display element see Section 7 7 User menu Switch off please wait until the LEDs extinguish Remove the hood as described in section 5 6 Remove the plus or minus c...

Страница 36: ...splay element 7 1 Menu overview Switching operation System ON OFF Standby Continuous ON OFF Activate test Light test Battery test Device test Menu Programming User Service Installer Information Networ...

Страница 37: ...ns OK tt mm yyyy hh mm Menu INFORMATION Customer service Softwareversion Network OK QUATTRO SOFTWAREVER Display X X Board X X Charger X X OK 1x Information Switching action Activate test Programming O...

Страница 38: ...OC OFF SC ON OK 1x OK 1x Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh mm Menu SWITCHING ACTION System OFF OC OFF SC ON OK 1x OK 2x Information...

Страница 39: ...on The Equipment test and Battery test are activated manually in the same way as the lights test Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh...

Страница 40: ...ps is 0000 Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh mm Menu PROGRAMMING User Electrician Service 3x USER MANUAL PASSWORD XXXX OK OK OK Pro...

Страница 41: ...tion not used must be selected here Calibrate circuit 1x OK TIMER No X tt mm yyyy hh mm USER MANUAL Date time Set Timer Calibr circuit TIMER CONFIG No 1 Switch ON TIMER CONFIG No X period once OK OK O...

Страница 42: ...MANUAL Set Timer Calibr circuit Setups LIGHTS Light log on off Lights text Lights scan CIRCUIT SELECTION Circuit X Ci0X OK OK OK OK OK NEW PROGRAMMING Save yes no LIGHT LOG ON OFF 1 M 10 11 20 Ci0X Sa...

Страница 43: ...om power Switch on again according to point 6 Commissioning Restart save no back to user manual PASSWORD old XXXX new XXXX USER MANUAL Calibr circuit Setups Password New Password accepted USER MANUAL...

Страница 44: ...he next window select next circuit or press back or the menu key SETUPS Lights Circuit Input INSTALLATION MENU Setups Collective fault Charge management CIRCUIT Circuit type Circuit text Current toler...

Страница 45: ...arge management CIRCUIT Circuit type Circuit text Current tolerance CIRCUIT SELECTION Circuit X Ci0X OK OK 1x OK OK 2x NEW PROGRAMMING Save yes no CURRENT TOLERANCE Circuit X 20 Save CIRCUIT SELECTION...

Страница 46: ...e management INPUTS PROPERTY Switch function Inputs text INPUT SELECTION Input X Input X OK 2x OK OK OK 2x NEW PROGRAMMING Save yes no DESCRIPTION Input X Your input text Save INPUT SELECTION Input X...

Страница 47: ...witch back time UNDERVOLTAGE 197 V OK 3x OK OK OK NEW PROGRAMMING Save yes no Save PHASE MONITOR Undervoltage Hysteresis Switch back time OK OK SETUPS Circuit Inputs Phase monitor INSTALLATION MENU Se...

Страница 48: ...or the menu key Setups Loop monitoring The name of the loop monitoring can be changed by using a USB keyboard To do this connect a standard USB keyboard to the USB port on the top SETUPS Circuit Inpu...

Страница 49: ...MANAGEMENT Battery selection Initialize charger Batt Circ Monit INSTALLATION MENU Setups Collective fault Charge management BATTERY SELECTION 17Ah 1hour 200W 24Ah 1hour 280W 34Ah 3hour 180W NEW PROGR...

Страница 50: ...ement Test Time INSTALLATION MENU Collective fault Charge management Test Time OK OK 3x PROGRAMMING LPS is programmed INSTALLATION MENU Charge management Test Time LPS programming INSTALLATION MENU Ch...

Страница 51: ...loading the configuration the LPS will be programmed automatically Without USB stick the following message appears Save INSTALLATION MENU LPS programming Password Save Config INSTALLATION MENU LPS pro...

Страница 52: ...he case of static selection the corresponding data IP network mask gateway must be entered manually via the MENU item Address see the next page DN Programming Add Remove INSTALLATION MENU Save Config...

Страница 53: ...rrent is determined correct current value end with the left arrow The current is measured using a pair of current clamps to measure the current on the plus or minus line and compare it with the left v...

Страница 54: ...ion 7 7 Then remove the CAT cable at the display A2 connector X1 The battery G2 is located on the upper right hand side of the display panel Use plastic tweezers pin to push the battery up from below...

Страница 55: ...shes and fault lights up Output circuit fuse on the circuit module defective Check connected Lights for short circuits Lights missing e g Ci01 L01 Lights defective Incorrectly coded module Module defe...

Страница 56: ...system documentation quattro GB V13 docx Page 56...

Страница 57: ...system documentation quattro GB V13 docx Page 57 Free for Test Report...

Страница 58: ...system documentation quattro GB V13 docx Page 58 Free for Test Report...

Отзывы: