system documentation quattro GB V13.docx / Page 34
6.
Commissioning
6.1 Checks before commissioning
-
Make sure that all connecting cables are de-energised and secure them against unintentional restarting (e. g. by removing all fuses and by securing the distributor of the general
power supply with signs and/or locks).
-
Remove the fuses F1-5 (mains fuse / final circuit fuses).
-
Check that the mains, control and final circuit terminals are firmly seated.
-
Check whether the battery connection cables on the charging unit (8) are correctly plugged in. Do not connect the battery!
-
Check that the memory card is correctly inserted.
-
Compare the value of the battery voltage with the nameplate.
6.2 Commissioning
6.2.1 Notes on voltage measurements
-
Measurements of the supply voltages and the final circuits must only be carried out by qualified electricians!
-
Observe the hazards specific to multiphase power supplies when carrying out measurements on them.
-
Only use suitable measuring instruments for voltage measurement.
-
Only GfS service personnel may carry out measurements in the internal installation area.
6.2.2 Connection of the mains supply line
Before connecting the supply lines, the value of the mains voltage must be measured and compared with the data on the nameplate.
After the measurement, disconnect the mains cables and secure them! Connect the mains cable to the mains terminals.
6.2.3 Connecting the mains supply and monitoring the system startup
The system is started by inserting fuse F5. (Do not mix up fuses!)
Wait for system startup, this usually takes about 45s. The system has started up when the display lights up or when Operation appears in the first line.
The four power circuit LEDs (SK1-4) flash, the operation and fault LED lights up.
6.2.4 Switching on the battery
Before connecting the battery cables, the battery voltage must be measured with a suitable measuring device and must be compared with the value on the nameplate.
If the value is correct, the battery cable can be connected to the battery with correct polarity.
6.2.5 Monitoring of battery voltage and charging current on the master display
After the mains supply and battery voltage have been switched on, the charging voltage and charging current must be checked in the display under the “Backup supply OK” menu
item. To do this, use the navigation keypad to select the backup supply and confirm with the OK key.
Содержание NETLIGHT Quattro
Страница 2: ...system documentation quattro GB V13 docx Page 2...
Страница 3: ...system documentation quattro GB V13 docx Page 3...
Страница 4: ...system documentation quattro GB V13 docx Page 4...
Страница 26: ...system documentation quattro GB V13 docx Page 26 5 1 2 Circuit diagram Messages inputs E5 9 panel module BUS...
Страница 27: ...system documentation quattro GB V13 docx Page 27 5 2 1 Terminal diagram X2 X4 X5...
Страница 28: ...system documentation quattro GB V13 docx Page 28 5 2 2 Terminal diagram X6 X8 X9...
Страница 29: ...system documentation quattro GB V13 docx Page 29 5 3 Mains connection panel connection...
Страница 30: ...system documentation quattro GB V13 docx Page 30 5 4 Three phase monitoring X0...
Страница 31: ...system documentation quattro GB V13 docx Page 31 5 5 Digital inputs 1 4 230V AC...
Страница 56: ...system documentation quattro GB V13 docx Page 56...
Страница 57: ...system documentation quattro GB V13 docx Page 57 Free for Test Report...
Страница 58: ...system documentation quattro GB V13 docx Page 58 Free for Test Report...