Fusion process
Operating Instructions MSA 2 MULTI
12
2.4 Connect
fitting
The first step the operator has to connect the fitting.
As soon as a fitting presence is recognized, the MSA 2 MULTI
moves automatically forward, asking for the fusion parameters in
case of PB/PP-R/PE material.
This is also pointed out by a double short tone of the MSA 2
MULTI and the barcode scanner.
In case of PP, as there may be multiple coils connected in
parallel, the MSA 2 MULTI will show how many are present: to
do that, the user has to connect the coils one after the other, and
the unit will add a bullet, on the screen to report the coil is ok
(connected properly, no short or open circuit) or not.
t = ----s
Vo= --.-V
R = 07.45
------
------
12/06/12 15:50
25°C
2.5
Enter operator code/job number
At the beginning the user can add some work site information,
like the operator code and the job number for the next welding.
The reading of the operator code can be set as mandatory or left
optional.
When the leads are properly connected to the fitting, the control
unit checks the fitting resistance and displays it to the user.
Before the acquisition of the fusion parameters, the user can
read with the scanner the operator badge (ISO 12176-3
compliant) and the job number.
Содержание MSA 2 MULTI
Страница 2: ......
Страница 29: ...Operating Instructions MSA 2 MULTI Accident Prevention 27...
Страница 30: ...Bedienungsanleitung GF Piping Systems MSA 2 MULTI Elektroschweissger t...
Страница 32: ...Operating Instructions MSA 2 MULTI 30 8 6 Arbeitssicherheit 56 8 7 Entsorgung 56...
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......