32
2.6
Function test
Before handing over the system, you must test all the functions of the RWA-Emer-
gency Power Control System. These tests must also be performed during the annual
maintenance work.
1. Check - with the mains power switched off - that the terminals and mountings are
tight.
2. Check the power supply unit and charger.
3. Check the batteries.
4. Check the ventilation operation (opening and closing, LEDs).
5. Check the alarm functions (smoke sensor, heat differential sensor, RWA switch,
coupled RWA-Emergency Power Control System) both operating from the mains
as well as from emergency power (battery).
6. Check external connections (such as rain/wind sensor).
DANGER
Risk of death through electrical shock!
➮
Before touching terminals or mountings, switch off the mains circuit and take
precautions to prevent others from switching it back on.