3
Checking electrical connection .............................................................................................................16
Applying mains voltage .........................................................................................................................16
Contents
- continued -
Commissioning
Page
Limit switch ..........................................................................................................................................16
Note .....................................................................................................................................................16
Operation
Faultfinding list for troubleshooting ......................................................................................................17
Operation Malfunctions
Danger .................................................................................................................................................18
Disposal................................................................................................................................................18
Decommissioning
Limit switch ..........................................................................................................................................16
Performance test
Содержание URS 2
Страница 1: ...1 URS 2 Installation Instructions 818869 01 Limit Switch URS 2 GESTRA Steam Systems EN English ...
Страница 8: ...8 Technical Data continued Dimensions Fig 2 106 7 32 51 Fig 3 112 85 ...
Страница 9: ...9 Design Fig 6 7 2 3 6 5 4 Fig 4 Fig 5 1 1 URS 2 ...
Страница 10: ...10 Functional Elements URS 2 Fig 7 a 8 9 0 MAX 55 C MAX 95 IP 20 ...
Страница 13: ...13 Installation continued Examples of Installation 4 2 5 8 6 6 3 1 MAX 55 C MAX 95 IP 20 Fig 9 Fig 8 7 7 ...
Страница 19: ...19 For your notes ...
Страница 20: ...20 818869 01 05 2012cm 808234 02 GESTRA AG Bremen Printed in Germany Agencies all over the world www gestra de ...