16
Apply mains voltage to the limit switch URS 2.
Commissioning
Make sure that the URS 2 is wired according to the wiring diagram.
Fig. 10
Checking electrical connection
Applying mains voltage
Performance test
1. Increase the 0/20 mA signal of the external measuring sensor until it exceeds the MAX
switchpoint adjusted in the URS 2. The LED
8
must light up and the MAX relay must be energized.
2. Decrease the 0/20 mA signal of the external measuring sensor until it falls below the MIN
switchpoint adjusted in the URS 2. The LED
0
must light up and the MIN relay must be energized.
Limit switch
Operation
Operation in combination with external measuring sensors, e. g. GESTRA level transmitter NRT 21b,
continuous blowdown controller LRR 15b und conductivity transmitter LRT 15b, LRT 16b or level
monitoring system NRGT 261 and conductivity monitoring system LRGT 161, LRGT 162.
Limit switch
Note
n
To analyse and eliminate malfunctions refer to section “Fault finding list for trouble
shooting” on page 17.
Содержание URS 2
Страница 1: ...1 URS 2 Installation Instructions 818869 01 Limit Switch URS 2 GESTRA Steam Systems EN English ...
Страница 8: ...8 Technical Data continued Dimensions Fig 2 106 7 32 51 Fig 3 112 85 ...
Страница 9: ...9 Design Fig 6 7 2 3 6 5 4 Fig 4 Fig 5 1 1 URS 2 ...
Страница 10: ...10 Functional Elements URS 2 Fig 7 a 8 9 0 MAX 55 C MAX 95 IP 20 ...
Страница 13: ...13 Installation continued Examples of Installation 4 2 5 8 6 6 3 1 MAX 55 C MAX 95 IP 20 Fig 9 Fig 8 7 7 ...
Страница 19: ...19 For your notes ...
Страница 20: ...20 818869 01 05 2012cm 808234 02 GESTRA AG Bremen Printed in Germany Agencies all over the world www gestra de ...