14
M
G
E
S
T
R
A
S
te
a
m
S
y
s
te
m
s
G
E
S
T
R
A
S
te
a
m
S
y
s
te
m
s
G
E
S
T
R
A
L
R
G
T
....
G
E
S
T
R
A
L
R
G
T
µ
S
-p
p
m
Installation examples
LRGT 16-1, LRGT 16-2, LRGT 17-1
Fig. 8
Conductivity monitoring and continuous boiler blowdown, installation of conductivity transmitter in the
blowdown line via a separate level pot
d
c
DN 15-40
Outlet
Inlet
DN 15-40
e
a
LRGT 16-1
LRGT 16-2
LRGT 17-1
G 1 A, ISO 228
Key
0
Boiler drum
a
Sealing ring 33 x 39, form D, DIN 7603,
1.4301, bright annealed
b
T-type connector,
provided on boiler, DN 50
c
Shut-off valve GAV
d
Continuous blowdown valve BAE
e
Level pot
f
Cover screws (cross recess head screws M4)
g
Housing cover
h
EMC cable gland M 20 x 1.5
i
Fixing nut for terminal box
j
Code switch
k
LED 1 green
l
LED 2 red
m
Terminal lugs for electrode wires,
functional earth
n
Terminal strip
o
Fixing screw for electronic circuit board
p
Connection for functional earth
continued
continued