13
GE
ST
RA
Ste
am
Sy
ste
m
s
GE
ST
RA
Ste
am
Sy
ste
m
s
GE
ST
RA
LR
GT
..
..
GE
ST
RA
LR
GT
µS
-p
pm
NW
LW
NB
A
R*
Installation examples
LRGT 16-1, LRGT 16-2, LRGT 17-1
Fig. 6
Conductivity monitoring, conductivity transmitter directly installed via flanged connection on side of boiler
LRGT 16-1
LRGT 16-2
LRGT 17-1
0
a
415
336
G 1 A, ISO 228
R*: LRGT 16-1, LRGT 17-1 R = 30 mm
LRGT 16-2
R = 60 mm
Conductivity monitoring and continuous boiler blowdown, direct installation of conductivity trans-
mitter via T-type connector and connection of a continuous blowdown valve
Fig. 7
LRGT 16-1
LRGT 16-2
LRGT 17-1
R*: LRGT 16-1, LRGT 17-1 R = 30 mm
LRGT 16-2
R = 60 mm
~ 250
NW
LW
NB
R*
GE
ST
RA
Ste
am
Sy
ste
m
s
GE
ST
RA
Ste
am
Sy
ste
m
s
GE
ST
RA
LR
GT
...
.
GE
ST
RA
LR
GT
µS
-p
pm
600
336
~ 250
197
G 1 A, ISO 228
DN
A
[mm]
15
182
20
184
25
184
40
189
0
d
c
b
a
DN 50
DN 50
A