background image

15

Item

Designation

Torque [Nm]

G

Thermovit regulator 

140

NM

Hexagon bolts/hexagon nuts

45

A

Union nuts

30

All torques are based on room temperature 20°C, threads without lubricant.

*)  Min. order quantity 20 items. For smaller quantities, please contact your specialist retailer.

Spare Parts

Spare parts list

Taking out of Service

Danger

The equipment is under pressure and hot during operation. Risk of injuries and severe 

burns to the entire body.
Only perform installation and maintenance work when the equipment is not under pressure 

(0 bar) and is cold (20 °C).
Before performing installation or maintenance work, isolate the equipment from upstream 

and downstream pressure, and vent it.
Sharp edges on inner parts present a danger of cuts to hands.
Always wear industrial gloves when working on the equipment. 

Attention

  If there is a risk of frost, drain the trap.

Disposal

The equipment must be disposed of in accordance with statutory waste disposal regula-

tions.

Item

Designation

Stock code

C

Packing 9 x 14 x 7 *)

376552

CGJ

Thermovit regulator, set of gaskets

098847

HJ

Strainer, body gasket

375698

J

Body gasket *) 92.7 x 102 x 1, graphite

375699

Содержание BK 15

Страница 1: ...1 BK 15 DN40 DN 50 Steam Trap E N English Original Installation Instructions 810682 03 ...

Страница 2: ...of supply 6 Description 6 Design 6 Technical Data Rating plate marking 7 Components Component parts of BK 15 8 Key 9 Installation BK 15 10 Danger 10 Flanged version 10 Socket weld version 10 Butt weld version 11 Attention 11 Heat treatment of welds 11 Bringing into Service BK 15 12 Danger 12 Adjusting the regulator supercooling controlled steam flowrate 12 Restoring the factory settings 12 Tools 1...

Страница 3: ... Maintenance BK 15 13 Danger 13 Checking the steam trap 13 Cleaning replacing the Thermovit regulator and strainer 14 Tools 14 Torques 14 Spare Parts Spare parts list 15 Taking out of Service Danger 15 Attention 15 Disposal 15 ...

Страница 4: ...g on the equipment Attention The rating plate specifies the technical features of the equipment Do not bring into service or operate any equipment that does not bear its own specific rating plate The pressure and temperature data on the trap s rating plate must conform to the requirements of the system Application of European Directives Pressure Equipment Directive The equipment conforms to this d...

Страница 5: ...eclaration of Conformity or Manufacturer s Declaration You can request the valid Declaration of Conformity or Manufacturer s Declaration from the address below Modifications to the equipment not approved by us will cause this Declaration to lose its validity GESTRA AG Münchener Strasse 77 28215 Bremen Germany Tel 49 421 3503 0 Fax 49 421 3503 393 E mail info de gestra com Web www gestra com ...

Страница 6: ...he Thermovit regulator can be adjusted from the outside With integral strainer and non return valve unit Asbestos free body gasket graphite Installation in any position The steam trap is factory set to discharge condensate with virtually no banking up Greater supercooling can be set manually from the outside after installation The trap vents independently both when the system is started up and dur...

Страница 7: ...Information booklets The type and version are indicated on the rating plate or body Manufacturer s name logo Type designation Pressure class PN or Class Material number Direction of flow Stamp on body rating plate e g indicates the quarter and year of manufacture example 1st quarter of 2010 1 10 Technical Data Fig 1 Thermovit regulator Standard version 30K supercooling U Nominal size Ratings to EN...

Страница 8: ...8 Component parts of BK 15 Components Fig 2 A B C E F G J H D I K L M N ...

Страница 9: ... nut G B Stuffing box ring C Packing 9 x14 x 7 D Cover E Adjusting fork F Guide ring G Thermovit regulator H Strainer I Bush force fit no spare part J Body gasket 92 7 x 102 x 1 K Body L Rating plate M Hexagon nut M12 N Hexagon bolt M12 ...

Страница 10: ... the correct installation position 2 Ensure the correct direction of flow The direction of flow arrow is on the trap body 3 Leave sufficient space for servicing When the trap is installed a minimum space of 90 mm is required for opening cover D 4 Remove the plastic plugs They are used only as transit protection 5 Clean the sealing surfaces of both flanges 6 Install the trap Socket weld version 1 E...

Страница 11: ...sing arc welding welding process 111 and 141 to DIN EN 24063 or gas welding welding process 3 to DIN EN 24063 or equivalent standard Attention Steam traps may only be welded in pipes by welders with test certification to DIN EN 287 or equivalent qualifications Heat treatment of welds Subsequent heat treatment of welds is not necessary provided the pipe is made from similar material to the trap bod...

Страница 12: ...ing process this can be set when bringing into service or during operation 1 Pay attention to the Danger note Slacken union nut A one turn and turn adjustment screw E clockwise using a screwdriver A 1 8 turn corresponds to a 4 K change in tem perature Starting from the factory setting you can turn adjustment screw E clockwise a maximum of 1 5 turns 2 A controlled steam flowrate can also be set if ...

Страница 13: ...uring operation Risk of injuries and severe burns to the entire body Only perform installation and maintenance work when the equipment is not under pressure 0 bar and is cold 20 C Before performing installation or maintenance work isolate the equipment from upstream and downstream pressure and vent it Sharp edges on inner parts present a danger of cuts to hands Always wear industrial gloves when w...

Страница 14: ...surfaces with heat resistant lubricant e g OKS 217 8 Insert a new body gasket J 9 Insert strainer H 10 Screw in Thermovit regulator G and tighten to the torque specified in the table 11 Place cover D on body K and tighten hexagon bolts N and hexagon nuts M cross wise to the torques specified in the table Tools Screwdriver 5 5 100 DIN 5265 form A Combination spanner size 36 mm AF DIN 3113 form B To...

Страница 15: ...Before performing installation or maintenance work isolate the equipment from upstream and downstream pressure and vent it Sharp edges on inner parts present a danger of cuts to hands Always wear industrial gloves when working on the equipment Attention If there is a risk of frost drain the trap Disposal The equipment must be disposed of in accordance with statutory waste disposal regula tions Ite...

Страница 16: ...a 808534 04 GESTRA AG Bremen Printed in Germany GESTRA AG Münchener Strasse 77 28215 Bremen Germany Tel 49 421 3503 0 Fax 49 421 3503 393 E mail info de gestra com Web www gestra com Agencies all over the world www gestra de ...

Отзывы: