Gesa GH-800 Скачать руководство пользователя страница 3

Standalone HVAC Room Energy Sensor 

 

 

 

 

G

G

G

G

ESA

ESA

ESA

ESA

 

 

 

Termination Diagram 

 
 
 
 
 
 

 
 

To connect the wires between GH-MS1 and other components of the system, the terminals of GH-MS1 should be connected with correct 
wire to ensure optimum performance. Each terminal block of GH-MS1 are described as follow in the left to right sequence. 

 

 

SLA 

This terminal and terminal “GND” are for connection with the N.O. output of slave sensor. If multiple slave sensors are used, 
 the connection should be made in parallel. 
 

GND 

This ground terminal normally pairs with SLA or DSW for connection of slave sensor or door switch. 
 

DSW 

This terminal and terminal “GND” are for connection with the door switch. If multiple door/window switches are used, the  
connection should be made in series. 
 

-OCC+ 

These two terminals provide occupancy status output for guest-in-room detection. 
 

-24V+ 

These two terminals are for the input of 24V power supply from power pack. 
 

NC 

This terminal and terminal “COM” form the Normally Closed (NC) output of GH-MS1. 
 

COM

 

Common pole of relay output. 
 

NO 

“NO” and terminal “COM” form Normally Open (NO) output of GH-MS1. 

 
 
 
 

 

 

 

 

Содержание GH-800

Страница 1: ...ance of the system please carefully read this instruction before installing Applications Benefits Resort Hotel Motel Guestrooms School College Dormitories Timeshare Vacation Units Military Lodging Fac...

Страница 2: ...c control in an aesthetically pleasing housing It should be mounted on the wall corner mount recommended to detect the presence of human by sensing the movement of body heat energy In addition to the...

Страница 3: ...e used the connection should be made in parallel GND This ground terminal normally pairs with SLA or DSW for connection of slave sensor or door switch DSW This terminal and terminal GND are for connec...

Страница 4: ...manner that it will not be damaged by hotel guest or housekeeper Mount the Sensor GH MS1 1 Remove the sensor cover by releasing the locking screw at the bottom of the housing 2 Carefully remove the c...

Страница 5: ...tallation Reflective materials mirrors shiny metal sheets marble tiles etc could reflect the infrared energy emission The sensor should be mounted at 8 ft above the floor preferably in a corner that h...

Страница 6: ...ut format Place the jumper on both pins will make the relay contact with 24V power If dry contact no load output is required remove the jumper off the pins disconnect the pins 4 Restart delay enable d...

Страница 7: ...d ensure to place the jumper JP7 to NORMAL position for normal operation of the system The normal operation of GH 800 is quite sophisticated Many different operation modes and statuses are carefully m...

Страница 8: ...nce is required The GH 800 is not field serviceable and should be returned if repair is needed field repair should not be attempted and may void warranty Be sure to include a brief description of the...

Отзывы: