![Geotech SitePro Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/geotech/sitepro/sitepro_installation-and-operation-manual_2215576011.webp)
9
Grounding
If an earth ground terminal is not available, then a ground spike must be installed.
Connect all non-current carrying metal parts to the common ground.
Sensor Wiring
Wire the sensors to the designated ports on the
“Sensor In” terminal strip as seen in
Figure 2-7.
Figure 2-7:
Sensor connections to terminal strip
Содержание SitePro
Страница 1: ...Rev 5 6 2020 Part 22350001 SitePro Telemetry System Installation and Operation Manual...
Страница 2: ......
Страница 18: ...16 Section 7 System Schematics Figure 7 1 Solar Panel and Sensor Input Wiring...
Страница 21: ...19 Revision History Project Description Date 1849 Release StellaR date...
Страница 22: ...20 NOTES...