11
V1.4 March 15
It is VITAL that personnel responsible for the installation and
use of the NATM cells READ and UNDERSTAND the manual,
prior to working with the equipment.
**********
As stated before, it is vital to check all the equipment in the shipment soon after
taking delivery and well before installation is to be carried out. Check that all
components that are detailed on the shipping documents are included.
5.0
INSTALLATION
This section of the manual is intended for all users of
Geosense
®
NPC
-
3000 NATM
Cells
and is intended to provide guidance with respect to their installation.
It must be remembered that no two installations will be the same and it is inevitable
that some
‘
fine tuning
’
of the following procedures will be required to suit specific site
conditions.
5.1.2 Tangential cell (VWNPC
-
3000)
Typical installation is by using short
pieces of steel rebar grouted inside short
boreholes and protruding into the area where
the lining will be placed.
STEP 1
-
place a
VWNPC
-
3000
tangential
stress cell onto two horizontal re
-
bar mountings.
STEP 2
-
carefully bend the pressure tube 90
degrees away from the tunnel wall so that it
protrudes through the shotcrete lining and can
be accessed for re
-
pressurising.
STEP 3
-
tie to the re
-
bars using soft iron wire
connected to the lugs at the corners of the cell.
5.1 Cell Installation
Cells are positioned on the wall of the tunnel in two ways, one way to monitor
tangential
stresses and the other to measure
radial
stresses.
CELL MUST BE INSTALLED
PERPENDICULAR TO TUNNEL
LINING
Содержание VWNPC-3000
Страница 1: ...V1 4 March 15 I N S T R U C T I O N M A N U A L NATM STRESS CELLS VWNPC 3000...
Страница 21: ...21 V1 4 March 15 6 3 Calibration certificate...
Страница 29: ...29 V1 4 March 15 NOTES...
Страница 30: ...30 V1 4 March 15...