Part No. 82595
Genie Z-45/25 DC & Genie Z-45/25J DC
19
Operator's Manual
Second Edition · First Printing
FUNCTION TESTS
Test the Drive Enable System
37 Press down the foot switch and lower the boom
to the stowed position.
38 Rotate the turntable until the primary boom
moves past one of the non-steer wheels.
Result: The drive enable
indicator light should come
on and remain on while the
boom is anywhere in the
range shown.
39 Move the drive control handle off center.
Result: The drive function should not operate.
40 Move and hold the drive enable toggle switch to
either side and slowly move the drive control
handle off center.
Result: The drive function should operate.
Note: When the drive enable system is in use, the
machine may drive in the opposite direction that the
drive and steer control handle is moved.
Use the color-coded direction
arrows on the platform
controls and the drive chassis
to identify the direction of
travel.
Test Auxiliary Controls
41 Pull out the red Emergency Stop button to
the on position.
42 Press down the foot switch.
43 Simultaneously hold the auxiliary power switch
on and activate each function control handle or
toggle switch.
Note: To conserve battery power, test each
function through a partial cycle.
Result: All boom and steer functions should
operate. Drive functions should not operate with
auxiliary power.
Test the Lift/Drive Select Function
(if equipped)
44 Press down the foot switch.
45 Move the drive control handle off center and
activate a boom function toggle switch.
Result: No boom functions should operate. The
machine will move in the direction indicated on
the control panel.
Blue
Yellow