Genesys EXPO 4 Скачать руководство пользователя страница 4

Side Cladding Installation

1

1

2

2

3

3

Side Cladding is installed in the first part of the 
bay assembly, when two uprights are connected 
either by battens (expo 4) or shelf carriers (expo3) 
with feet attached - so you have completed step 2 
on the bay assembly instructions.

1.

 Lean the connected frame to the side and slide 

in the first steel sheet clad in between the uprights 
inner gaps.

2.

 Attach plastic joining rib to the top of the first 

steel sheet clad.

3.

 Slide in another steel sheet clad panel the 

same way as the first one to sit in the ridge of the 
joining rib.

4.

 Once all frames requiring side cladding are 

assembled, continue building the bay as 
described on the bay assembly instructions
- step 3 and onwards.

Mesh Side Panel Installation

Mesh Side panels can be attached at any time 
after the bay has been assembled.

 

1.

 Insert the Cable tie into the upright’s inner gap 

via the 13mm diameter hole.

2.

 Position the mesh as required and loop the tie 

around the outer wire of the mesh.

3.

 Repeat the process along the whole height of 

the bay and on both sides of the mesh. Use as 
many ties as required - approx 2-3 ties per meter 
per side.

4.

 Install all the additional mesh as required. 

4

4

Steel Clad

Uprights

Top View

Uprights

Cable Ties

Mesh Panel

Steel Clad

Steel Clad

Plastic Joining Rib

EXPO SIDE CLADDING

Assembly  Instructions

Содержание EXPO 4

Страница 1: ...the uprights 2 Attach the horizontal battens to join the uprights together and push lug in using the athead screwdriver repeat for the second frame 3 Insert shelf clips at desired heights to position...

Страница 2: ...tom Use the M6x15 nuts and bolts to x the H brace to the uprights locate the right 2 holes on the H Brace matching the holes on the uprights depending on the shelf height they might be at a different...

Страница 3: ...onto the edge of the shelf and run through another cable tie to connect the clip and the back mesh Use the clip on every 2nd shelf Hook in Back Cladding Installation Depending on the height of the ba...

Страница 4: ...Once all frames requiring side cladding are assembled continue building the bay as described on the bay assembly instructions step 3 and onwards Mesh Side Panel Installation Mesh Side panels can be at...

Страница 5: ...ay together with the next upright for the connecting bay overlaping the previous piece of top cladding sheet Secure using the screws as per the screw positions diagram 5 Now slide in the next lower cl...

Страница 6: ...oo 4 shelves are connected using shelf clips 6 7 8 H 3000mm Long section 1045mm Clad 1045mm Clad 1045mm Clad 1045mm Clad 1045mm Clad 1345mm Clad 1345mm Clad 1345mm Clad 1345mm Clad H 2500mm Diagram Sc...

Страница 7: ...with the screws as shown on the screw positions diagram 4 Attach the next top cladding sheet to the upright on the extension bay overlaping the previous piece of top cladding Secure using the screws a...

Страница 8: ...t screw The side of the clad sheet where the first hole is further from the edge than on the other side Make sure the long section is at the right side top or bottom when installing the cladding H 220...

Отзывы: