![Genesis GRB 30 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/genesis/grb-30/grb-30_safety-and-operator-manual_2211092023.webp)
© 2020 Genesis Attachments, LLC
Genesis Rail Breaker GRB 30 23
ROTATOR INSTALLATION
Rotation Circuit - Gear Pump Type
Gear
Pump
Required
Rotation Valve
Three-position, tandem center,
spring-centered, with anti-cavi-
tation checks.
Relief Setting: 1950 (mounted
on excavator)
Hydraulic
Motor
Motion Control
Valve
Rotate Work Lines:
Use 1/2” 3000 PSI
rated hose
Inside Upper Head
Flow
Controls
Mount Valves in
Excavator
Case Drain