background image

               

G     1PC

                 

4*59

                     H   2 SET

STEP 6 :

 

Following below illustration Assembly Frame # 6.

Using hardware  #H connect Frame #5 with Wall to complete .

COMPLETED BUNK BED

NOTE: Tighten all step before using. Thank you.

TWIN OVER TWIN BUNK BED

 ASSEMBLY INSTRUCTIONS
             SKU : MF286439

       PAGE 8 OF 8

Содержание MF286439

Страница 1: ...TWIN OVER TWIN BUNK BED ASSEMBLY INSTRUCTIONS SKU MF286439 PAGE 1 OF 8 Weight Limit 350 Lbs Weight Limit 250 Lbs...

Страница 2: ...dder and other components are in their proper position free from damage and that all connectors are tight 8 Do not allow horseplay on or under the bed and prohibit jumping on the bed 9 Always use the...

Страница 3: ...DETAIL VIEW 1 1 1 1 2 6 3 5 4 7 8 9 9 12 12 13 13 15 14 10 2 11 19 11 19 10 2 TWIN OVER TWIN BUNK BED ASSEMBLY INSTRUCTIONS SKU MF286439 PAGE 3 OF 8...

Страница 4: ...PCS Hollow Screw holes 2 End guard rail 7 Guard rail 8 Guard rail 6 Ladder 3 End guard rail 4 End guard rail 5 End guard rail 1 Post 1PC 1PC 1PC 1PC 1PC 1PC 1PC 4PCS 1PC 2PCS 4PCS 38PCS 2PCS 2PCS 9 Si...

Страница 5: ...B D E F connect 1 with 2 3 6 12 13 to complete Frame 1 F 4PCS 20 20 B 4PCS 1 4 35 NOTE In this step DO NOT tighten any bolt until you connect all part together 4 59 G 1PC 4 59 PAGE 5 OF 8 D F B E E 4...

Страница 6: ...this step DO NOT tighten any bolt until you connect all part together NOTE In this step DO NOT tighten any bolt until you connect all part together PAGE 6 OF 8 9 11 10 C C 4 2 19 E A 9 A 6 A 6 D 6 D 6...

Страница 7: ...e 3 4 to complete Frame 5 NOTE In this step DO NOT tighten any bolt until you connect all part together G 1PC 4 59 A 16PCS 1 4 55 PAGE 7 OF 8 A C A 4 A 4 A 4 C C C C C 11 19 10 2 7 8 14 D 4PCS 1 4 10...

Страница 8: ...wing below illustration Assembly Frame 6 Using hardware H connect Frame 5 with Wall to complete COMPLETED BUNK BED NOTE Tighten all step before using Thank you TWIN OVER TWIN BUNK BED ASSEMBLY INSTRUC...

Отзывы: